Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />July 15, 2024 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />RE: Proposal for Design Services — Dickenson's Mississippi Estates — IP 25-04 <br />Dear Mr. Feriancek: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton- Men k.com <br />We understand that the City is proposing to reconstruct the streets within the Dickenson's Mississippi <br />Estates subdivision in 2025. <br />UNDERSTANDING <br />Based on communications with the City, we understand the following: <br />The project will include improvements to Tungsten Street from Rivlyn Avenue to Riverdale Drive and <br />also improvements to Rivlyn Avenue from the west cul-de-sac to east edge of the Dickenson's <br />Mississippi Estates plat. <br />Tungsten Street and Rivlyn Avenue are urban section roadways, including concrete curb and gutter, with <br />a storm sewer system and an outlet to the Mississippi River. The properties along the roadways are <br />serviced by municipal sewer and water. There is a need to replace the gate valves in the area, but the <br />City is also considering replacing the existing watermain with new PVC C900. <br />Because Tungsten Street serves adjacent commercial properties, consideration is being given to building <br />it back to a 10-ton design section, and build Rivlyn Avenue with a typical City street section. <br />The City is looking to address stormwater runoff from 6140 Hwy 10 (Lano) as part of this project. This <br />will include analyzing the stormwater runoff and recommending a solution. In general, the issue is with <br />runoff from the south end of Lano's property flowing onto 6151 Rivlyn Avenue. <br />The City will contract separately for sanitary sewer televising and also for geotechnical exploration. The <br />results and recommendations for each will be forwarded to us when available. <br />A completed topographical survey will be completed for the project. We will also complete a drone <br />flight to obtain aerial photography and provide elevation related information for the 6140 Hwy 10 <br />(Lano) property. <br />The cul-de-sac at the west end of Rivlyn Avenue is partially outside of City ROW. As part of the project <br />we will explore options to gain right-of-way or potentially shorten the length of the cul-de-sac to keep <br />the construction within the existing right of way. <br />Bolton & Menk is an equal opportunity empbo er. <br />