Laserfiche WebLink
Dickenson's Mississippi Estates — IP 25-04 <br />July 15, 2024 <br />Page 2 of 3 <br />The City would like to bid the project in February / March of 2025. We will include bidding the project, <br />as well as answering contractor questions, as part of our services. <br />The City typically holds an open house meeting in the fall for property owners impacted by projects. We <br />will prepare a preliminary site layout exhibit that the City can use at the meeting. <br />We have assumed the City will prepare any required feasibility report and/or council reports required <br />SCOPE OF WORK <br />Bolton & Menk will assist the City with survey, design, and bidding related services for the project. Our <br />work will include the following tasks: <br />• Survey — The survey will include right-of-way research along with a topographic survey and <br />drone image of the site. We have also included time associated with easement preparation. <br />• Design — Design services will generally include the following tasks: <br />o Attendance at design meetings. <br />o Site visits to review the existing roadways and adjacent properties. <br />o Construction Documents for the use of permitting, bidding and construction. <br />• Public Streets and Utilities - Design services to include: <br />o We have assumed that Tungsten Street will be designed to a 10-ton section, and <br />Rivlyn Avenue will be designed with a typical City street section. <br />o Review of sanitary sewer televising report and incorporation of findings into the <br />plans. <br />o Replacement of watermain gate valves and/or full watermain replacement. <br />o Stormwater calculations for the roadway improvements. Implement storm sewer <br />infrastructure improvements as needed. <br />o Perform a review and analysis of stormwater runoff from 6140 Hwy 10 (Lano). Bring <br />forward solutions for the City. We have not included significant improvements in <br />our proposal, but will complete plans for needed improvements as an additional <br />service. <br />o We will review the need for bicycle facilities associated with the Mississippi River <br />Trail through this area. <br />• Reviews — We will review the final documents with the City and make revisions as needed. <br />• Permits and Utilities — We have assumed permits will be required as follows: <br />o Lower Rum River Watershed Management Permit (New Impervious less than 1 Acre) <br />o Department of Health (Watermain) <br />o NPDES (Contractor Obtained) <br />• Bidding — We will work with the City to solicit bids for the work. <br />• Construction — Our proposal does not include time after bid opening. A separate proposal <br />can be provided at a later date for construction related services. <br />PROPOSED FEES <br />The fees listed in the attached spreadsheet are estimates based on each task. While the actual fees <br />required for each task may vary, the total amount of $68,537.00 is considered a Not -to -Exceed amount. <br />Bolton & Menk is an equal opportunity empbo er. <br />