My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 11/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:39:07 AM
Creation date
11/26/2024 2:12:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replace all curb in gutter in the reconstruction area between Sunfish Lake Boulevard and Nowthen Boulevard <br /> compared to spot repairs. <br /> Alpine Drive between Nowthen Boulevard and Saint Francis Boulevard(TH 47) is a combination of 44-foot-wide <br /> urban and rural section with an 8-foot bituminous trail on the south side of the street, and an 8-foot bituminous <br /> trail between Krypton Street and TH 47 on the north side of the street. The Anoka County signal upgrade at <br /> Nowthen Boulevard from 2024, including turn lanes for westbound Alpine Drive, reconstructed approximately <br /> 740 linear feet of Alpine Drive east of Nowthen Boulevard(generally to Krypton Street). This was found to <br /> generally be in good condition,with only refreshing of the pavement markings proposed in this section of Alpine <br /> Drive. The ADT for this segment of Alpine Drive is 2,500. Review of the geotechnical report found clean sands, <br /> ideal for both utility and pavement support. The total project length of Alpine Drive between Sunfish Lake <br /> Boulevard and TH 47 is approximately 1.02 miles. <br /> Alpine Drive is an MSA street and must meet MSA 10-ton pavement strength design requirements. To achieve <br /> this, staff is proposing to place 4.5-inches new bituminous over 5-inches aggregate base (9.5-inch total pavement <br /> section). The pavement cores produced as part of the geotechnical report found approximately 5-inches of <br /> bituminous over 4.5-inches aggregate base, which will allow the project to be built without additional subsoil <br /> excavation to achieve the proposed pavement section. The western 460 linear feet is proposed to only receive a <br /> 2-inch mill and overlay. Approximately 750 linear feet adjacent to the wetlands west of Nowthen Boulevard are <br /> proposed to be raised,which will require replacement of the concrete curb and gutter. Additionally, Staff will be <br /> reviewing the cost-effectiveness of replacing all concrete curb and gutter west of Nowthen Boulevard(in the <br /> areas proposed to be reconstructed). The section of Alpine Drive approximately 660 linear feet west and 460 <br /> linear feet east of Nowthen Boulevard is not proposed to receive a bituminous treatment, only refreshing the <br /> existing pavement markings. The remaining pavement, generally between Krypton Street and TH 47 is proposed <br /> to be reconstructed using the FDR method with only spot curb and gutter repairs. <br /> Bituminous trail exists throughout the project area, including on both sides of Alpine Drive for approximately half <br /> the project. In general, the bituminous trail is functional,but has deteriorated to a point where improvements to the <br /> trail are recommended. Staff is proposing to include reconstruction of the bituminous trail and associated <br /> pedestrian ramps as an alternative bid. In total there is approximately 7,600 linear feet of 8-foot bituminous trail <br /> within the project area. Replacement of this trail is not included within the CIP. Staff believes the majority of the <br /> trail should qualify for MSA funding if desired,but will look further into potential funding sources as part of the <br /> project design process. Staff estimates construction costs for the trail replacement at$250,000. <br /> Staff has identified an unmarked crossing at Sodium Street, connecting the Alpine Acres subdivision with the Fox <br /> Knoll subdivision to the south. Alpine Drive is a 45 mph(high speed)road, staff does not support a crossing at <br /> this location and is proposing to remove the pedestrian ramp on the south side of Alpine Drive with this project. <br /> The bituminous trail continues west to Sunfish Lake Boulevard which provides safe crossings, including crossing <br /> westbound to Alpine Park; the most likely destination for local trail users in this region of the City. Additionally, a <br /> marked mid-block crossing exists between Nowthen Boulevard and Helium Street, and a marked crossing exists <br /> at Helium Street. Staff is proposing to eliminate both of these marked crossings as part of this project,primarily <br /> due to Alpine Drive being a high speed(45 mph) street and safe signalized crossings located at traffic signals at <br /> both County and MnDOT roads. <br /> Watermain, sanitary sewer, and storm sewer exist throughout the project area. The only known utility <br /> improvements include storm sewer located in the wetland area west of Nowthen Boulevard. Two corrugated <br /> metal pipe(CMP) culverts are proposed to be upgraded to reinforced concrete pipe(RCP). In addition,two sets of <br /> storm sewer inlets and outlets to the wetlands exist in this stretch. By raising the roadway, at a minimum the <br /> catch basin castings will need to be adjusted,but may need to be replaced depending on how high the road is <br /> raised. Any additional repairs will not be known until the sewer televising reports are reviewed. If repairs are <br /> required, they will be included within the final plans,unless staff determines the repair needs are imminent. <br /> Additional Permitting <br /> Alpine Drive is an MSA street,which requires review and approval by the MnDOT MSA department prior to <br /> bidding the project. Because the project goes up to both the Anoka County and MnDOT right-of-way's, and will <br />
The URL can be used to link to this page
Your browser does not support the video tag.