My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 11/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:39:07 AM
Creation date
11/26/2024 2:12:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 26. <br /> CC Regular Session <br /> Meeting Date: 11/26/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Title: <br /> Adopt Resolution#24-343 Ordering Plans and Specifications for 2025 Crack Seal Improvements,Improvement <br /> Project#25-09 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-343 ordering plans and specifications for 2025 Crack Seal <br /> Improvements, Improvement Project#25-09. <br /> Background: <br /> The City's current pavement maintenance schedule calls for public streets to receive the following maintenance <br /> following construction, overlay, or reconstruction: <br /> •Year 2—Pavement Rejuvenator <br /> •Year 3 —Crack Seal <br /> •Year 5—Refresh Pavement Markings (If Applicable) <br /> •Year 7—Crack Seal <br /> •Year 10—Refresh Pavement Markings (If Applicable) <br /> •Year 14—Crack Seal <br /> •Year 15—Refresh Pavement Markings (If Applicable) <br /> •Year 20—Overlay or Reconstruction <br /> The above schedule is the typical maintenance schedule based off assumed ideal conditions. Staff reviews the <br /> condition of all streets annually and adjusts the schedule of maintenance operations based on actual pavement <br /> conditions. <br /> Crack seal improvements are completed annually, on between 10 and 23 miles of public street segments to <br /> cost-effectively maximize the life of the bituminous pavement. <br /> Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement <br /> and joints between the pavement and concrete curb and gutter, and utility castings. Reducing future pavement <br /> damage due to wet subgrade soils, especially during freeze-thaw cycles. <br /> A total of 19.90 miles of public streets are proposed to receive crack seal improvements in 2025. These street <br /> segments were selected based on age,pavement maintenance history, and Pavement and Surface Evaluation <br /> Rating (PASER)values. Selected streets generally have PASER values between 7 and 10. <br /> A draft 2025 Crack Seal Map is attached to this case for reference. Final plans and specifications are proposed to <br /> be prepared in-house as part of Staffs normal duties. <br /> Preliminary Schedule Remaining <br /> •November 26,2024 City Council Authorization to prepare plans and specifications <br /> •Dec 2024/Jan 2025 Staff prepares plans and specifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.