My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/25/2006
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2006
>
Agenda - Council Work Session - 07/25/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:47:31 PM
Creation date
7/24/2006 8:28:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE #3 <br /> <br />UPDATE ON THE FEASIBILITY OF INSTALLING SIDEWALK <br />IMPROVEMENTS ON WACO STREET <br />By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />At the September 2005 Public Works Committee discussion of providing safe <br />accommodations for non vehicular traffic along Waco Street in the Rivers Bend <br />subdivision resulted in a recommendation that staff pursue the development of a sidewalk <br />along Waco Street from Sunwood Drive to Rivers Bend Park and a trail connection <br />between Highway 47 and Waco Street. <br /> <br />Attached to this case is a sketch illustrating a proposed alignment of a trail/sidewalk <br />system. A concrete sidewalk would be placed along the west side of Waco Street between <br />Sunwood Drive and its intersection at 142nd Lane and then.continuing along the east side <br />of Waco Street from that point to the park entrance. A boardwalk/trail linkage would be <br />made between the existing TH N47 trail and Waco Street through the wetland (Outlot B) <br />and the City owned property (5200, on the city map). . <br /> <br />The sidewalk would be five feet wide and located one foot from the property line, <br />however some deviation from this would be required in selected locations to <br />accommodate wetland and mature trees. In general the route selected for this route could <br />be constructed with relatively few conflicts and a minor amount of retaining wall. Staff <br />will prepare a cost estimate for the construction of this system which is based upon the <br />experience with the sidewalk installation on 145th Lane'in 2004 that will be available at <br />the meeting. The unit prices will be increased for inflation by 20% since that time. <br /> <br />Action: <br /> <br />Staff is requesting direction as to implementation and funding once the cost estimates <br />have been received. <br /> <br />Reviewed By; <br />Public Works Director/Principal Engineer <br />Fire Chief <br />. Street Supervisor <br />Parks Supervisor. <br /> <br />PW: 07/18/06 <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.