Laserfiche WebLink
<br />Waco Street Sidewalk I Trail <br />Estimated Cost <br /> <br />Item Unit Quantity Unit Price Extension <br />Sawcut Bit Drwy If 648 $ 2.98 $ 1,928.45 <br />Sawcut Conc Drwy If 404 $ 5.28 $ 2,133.12 <br />Remove Bit Drwy sq yd 1080 $ 5.28 $ 5,702.40 <br />Remove Conc Drwy sq yd 680 $ 7.72 $ 5,246.88 <br />F&I 4in Sdwk sq ft 27100 $ 3.88 $ 105,039.60 <br />F&I 6in Sdwk sq ft 5280 $ 5.24 $ 27,688.32 <br />F&I Drwy Aprons ea 44 $ 866.29 $ 38,116.85 <br />F&I Ped ramp ea 8 $ 348.00 $ 2,784.00 <br />F&I Bit Drwy sq yd 324 $ 17.16 $ 5,559.84 <br />F&I Conc Drwy sq yd 204 $ 48.24 $ 9,840.96 <br />F&I Topsoil cu yd 593 $ 6.60 $ 3,913.80 <br />F&ISod sq yd 5379 $ 2.34 $ 12,586.86 <br />Traffic Control Is 1 $ 2,121.98 $ 2,121.98 <br />Protect Irrig system ea 22 $ 165.00 $ 3,630.00 <br />Broadwalk ft 280 $ 110.00 $ 30,800.00 <br />10 ft Bit Trail ft 180 $ 25.00 $ 4,500.00 <br />Retaining wall sq ft 400 $ 25.00 $ 10,000.00 <br />Construction Total $ 271,593.06 <br />With 25% Overhead $ 339,491.33 <br /> <br />Notes: <br /> <br />1 5420 feet of sidewalk <br />2 Involves 47 residential properties <br />3 Crosses 44 driveways; 27 bituminous; 17 concrete <br />4 Estimate half properties have irrigation systems <br />5 Units prices 120% of March 2004 project on 145th Lane <br />6 Driveway removals 40 sq yds/drive <br />7 Topsoil 11 linear ft / non driveway ft <br />8 6' sidewalk 24 ft I drive <br />9 Sod 11 ft / nondriveway ft <br />