Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />PAY ESTIMATE #6 <br />Rhinestone Street Bridge Project <br />S.A.P. 199.109.02 <br />CITY OF RAMSEY <br /> <br />Owner <br /> <br />July 11, 2006 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303-6197 <br /> <br />RE: Rhinestone Street Bridge - SAP. 199-109-02 <br />Contractor: Redstone Cons!ruction <br />Contract Amount: $993,907.82. <br />Award Date: October 13,2004 <br />Completion Date: August 15, 2005 <br /> <br />Dear Council Members: <br /> <br />The following work has been completed on the above-referenced project by Redstone Construction <br /> <br />BID SCHEDULE "A" SAP 199-109.02 - RHINESTONE STREET BRIDGE <br /> <br />Redstone Construction <br /> <br /> . . , <br /> . usea to <br />Item Description Estimated Quantity Unit Price Contract Price Date Extension <br />1 MOBILIZATION 1 LS $53,310,91 $ 53,310.91 1 $ 53,310.91 <br />2 COMMON EXCAVATION 1040 CY $6.77 $ 7,040.80 1040 $ 7.040.80 <br />3 SELECT GRANULAR MATERIAL 10% (CV) . 1430 CY $15.48 $ 22,136.40 1430 $ 22,136.40 <br />4 SELECT GRANULAR BORROW (CV) 150 CY $14.16 $ 2,124.00 150 $ 2,124.00 <br />5 AGGREGATE BASE (CV) CLASS 5 (MOD) 128 CY $33,27 $ 4,258.56 123.2 $ 4,098.86 <br />6 CONCRETE PAVEMENT STD. WIDTH 7.0" 136 SY $71.53 $ 9,728.08 112 $ 8.011.36 <br />7 STRUCTURAL CONCRETE 27 CY $100.64 $ 2,717.28 30 $ 3,019.20 <br />8 BRIDGE APPROACH PANEL 1.74 EACH $18,875.79 $ 32,843.87 1.74 $ 32,843.87 <br />9 STRUCTURAL CONCRETE (11'.43) 197 (P) CU. YD. $241.38 $ 47,551.86 197 $ 47,551.86 <br />10 STRUCTURAL CONCRETE (3Y43) 385 (P) CU. YD. $384.59 $ 148,067,15 385 $ 148,067.15 <br />11 STRUCTURAL CONCRETE (3Y36) 386 (P) CU, YD. $291.93 $ 112.684.98 386 $ 112,684.98 <br />12 TYPE MODIFIED P-2 RAILING CONCRETE (3Y46) 249 (P) L1N. FT. $84.14 $ 20,950.86 249 $ 20,950.86 <br />13 SIDEWALK CONCRETE (3Y46) 1475 (P) sa. FT. $6.22 $ 9,174.50 1475 $ 9,174.50 <br />14 REINFORCEMENT BARS 13165 (P) POUND SO.90 $ 11,848.50 13165 $ 11,848.50 <br />15 REINFORCEMENT BARS (EPOXY COATED) 139900 (P) POUND SO.88 $ 123,112.00 139900 $ 123,112.00 <br />16 STRUCTURE EXCAVATION 0.94 LUMP SUM $11,119.18 $ 10,452.03 0.94 $ 10,452.03 <br />17 FOUNDATION PREPARATION 1 LUMP SUM $36,131.95 $ 36,131.95 1 $ 36,131.95 <br />18 ORNAMENTAL METAL RAILING TYPE SPECIAL 311 (P) L1N. FT. $166.69 $ 51,840.59 311 S 51,840.59 <br />19 STRUCTURAL TUBE RAILING DESiGN T-1 224 (P) L1N. FT. $92.72 $ 20.769.28 224 $ 20,769.28 <br />20 EXPANSION JOINT DEVICES TYPE 4 110 L1N. FT. $116.57 $ 12.822:70 114.2 $ 13,312.29 <br />21 BEARING ASSEMBLY 12 EACH $883.02 $ 10,596.24 12 $ 10.596.24 <br />22 DRAINAGE SYSTEM TYP (B910) 0;87 LUMP SUM $1,106.09 S 962,30 0.87 $ 962.30 <br />23 CONCRETE WEARING COURSE (3U17A) 5550 (P) sa. FT. $6.22 $ 34,521.00 5550 $ 34.521.00 <br />24 C.I.P. CONCRETE PILING DELIVERED 12. 3090 L1N. FT. $21.93 $ 67,763.70 3026.5 . $ 66,371.15 <br />25 C.I.P. CONCRETE PILING DRIVEN 12. 3090 L1N. FT. $1.13 $ 3,491.70 2871 $ 3,244.23 <br />26 C.I.P. CONCRETE TEST PILE, 65 FT~LG. 12" 4 EACH $7 ,356.17 $ 29,424.68 4 S 29.424.68 <br />27 C.I.P. CONCRETE TEST PILE, 75 FT.LG.l2" 2 EACH $8,487.89 $ 16,975.78 2 $ 16.975.78 <br />28 CONDUIT SYSTEM (LIGHTING) 1 LUMP SUM - <br />$16,091,38 $ 16,091.38 1 $ 16,091.38 <br />29 4" CONCRETE WALK 1242 SF $4.73 $ 5,874.66 800 $ 3,784.00 <br />30 6" CONCRETE WALK 120 SF $6.86 $ 823.20 0 $ - <br />31 CONCRETE CURB AND GUTTER DESIGN B618 160 LF $26.07 $ 4,171.20 160 $ 4,171.20 <br />32 INTEGRANT CURB & GUTTER DESIGN B6 59 LF $14.36 $ 847.24 53.5 $ 768.26 <br />33 PEDESTRIAN CURB RAMP 2 EA $686.25 $ 1,372.50 0 $ . <br /> <br />Total Bid Schedule "A" - Rhinestone Street Bridge <br /> <br />$ 932,481.88 <br /> <br />$ <br /> <br />925.391,62 <br /> <br />. Revised Per Change Order No. 1 <br /> <br />.'.' .' <br /> <br />RA3173PEPay.Estim.'e ff6 <br /> <br />PE- 1 <br /> <br />-203- <br />