<br />PAY ESTIMATE #6 <br />Rhinestone Street Bridge Project <br />S.A.P.199-109..o2 <br />CITY OF RAMSEY <br /> <br />Owner <br /> <br />BID SCHEDULE "B" - RHINESTONE STEET BRIDGE (RAMSEY LOCAL FUNDINGl <br /> Used to <br />Item Description Estimated Quantity Unit Price Contract Price Date Extension <br />34 BRIDGE APPROACH PANEL 0.26 EACH $18,875.79 $ 4.907.71 0.26 $ 4.907.71 <br />35 STRUCTURAL CONCRETE (1A43) 19 (P) CU. YD. $241.38 $ 4.586.22 19 $ 4.586.22 <br />36 STRUCTURAL CONCRETE (3Y43) 37 (P) CU. YD. $384.59 $ 14.229.83 37 $ 14.229.83 <br />37 STRUCTURAL CONCRETE (3Y36) 56 (P) CU. YD. $291.93 $ 16.348.08 56 $ 16.348.08 <br />38 SIDEWALK CONCRETE (3Y46) 787 (P) sa. FT. $6.22 $ 4.895.14 787 $ 4,895.14 <br />39 REINFORCEMENT BARS 1045 (P) POUND $0.90 $ 940,50 1045 $ 940.50 <br />40 REINFORCEMENT BARS (EPOXY COATED) 17040 (P) POUND $0.88 $ 14,995.20 17040 $ 14,995.20 <br />41 STRUCTURE EXCAVATION 0.06 (P) LUMP SUM $11.119.18 $ 667.15 0.06 $ 667.15 <br />42 EXPANSION JOINT DEVICES TYPE 4 . 16 LIN. FT. $116.57 $ 1.865.12 16.6 $ 1.935.06 <br />43 DRAINAGE SYSTEM TYP (B910) 0.13 LUMP SUM $883.02 $ 114.79 0.13 $ 114.79 <br />44 C.I.P. CONCRETE PILING DELIVERED 12" 120 LIN. FT. $21.93 $ 2.631.60 119.9 $ 2.629.41 <br />45 C.I.P. CONCRETE PILING DRIVEN 12" 120 LIN. FT. $1.13 $ 135.60 119.9 $ 135.49 <br />46 S- PVC CASING PIPE 66 LF $2.81 $ 185.46 73.5 $ 206.54 <br />47 8" PVC CASING PIPE 66 LF $4.47 $ 295.02 71 $ 317.37 <br /> <br />. <br /> <br />Total Bid Schedule "B" - Rhinestone Street Bridge (Ramsey Local Funding) <br /> <br />s <br /> <br />66.797.42 <br /> <br />s <br /> <br />66,908.48 <br /> <br />CHANGE ORDER NO 1 <br /> <br /> Used to <br />Item Description Estimated Quantity Unit Price Contract Price Date Extension <br /> ADD SAWING OF THE SIDEWALK AND <br />48 APPROACH PANEL 1 LS $2,250.00 $ 2,250.00 1 $ 2,250.00 <br /> DEDUCT FOR ORNAMENTAL METAL AND <br />49 STRUCTURAL TUBE RAILING 1 LS $ (-7621.481 S (-7621.481 1 $ H621.48 <br /> <br />. Total Change Order NO.1 $ (-5371.48) $ (-5371.48) <br /> . <br />SUMMARY OF BIDDING <br />Base Bid <br />Bid Schedule "A" - S.A.P. 199-109..02 Rhinestone Street Bridge $ 932.481.88 $ 925,391.62 <br />Bid Schedule "B" - Rhinestone Street Bridge (Ramsey Local Funding) S 66,797.42 $ 66.908.48 <br />Base Bid Total $ 999,279.30 $ 992.300.10 <br />Change Order No.1 $ (-5371.48) $ (-5371.48) <br />TOTAL $ 993.907.82 $ 986.928.62 <br />LESS 5% RETAINAGE $ 49,346.43 <br />LESS PAY ESTIMATE #1 $ 237,321.60 <br />LESS PAY ESTIMATE #2 $ 133,656.69 <br />LESS PAY ESTIMATE #3 $ 139.378.03 <br />LESS PAY ESTIMATE #4 $ 248.4n.96 <br />LESS PAY ESTIMATE #5 $ 161.426.31 <br />WE RECOMMEND PAYMENT OF: $ 17.321.60 <br /> <br /> <br />ertify that all items and amounts are correct for the work completed to date. <br /> <br />(0 <br /> <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES. INC. <br />Certification by E~r: We recomme~ment.!2.rrKk ~ anad ~ qu,antities as shewn. <br />Signed:~ ~ ~ <br />Title~~~.---eT ~Date '7'//..2 /d t::, <br /> <br /> <br />~i:~:~: ~~~'- <br /> <br />Title: 0 P IA./ Q;;te <br /> <br />. <br /> <br />'-;h31()/" <br />I <br /> <br />-204- <br />RA3173PEPay E.:itirnale 116 <br /> <br />PE-2 <br />