My WebLink
|
Help
|
About
|
Sign Out
Home
04/05/88
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
04/05/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:06:47 AM
Creation date
7/26/2006 11:21:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
04/05/1988
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 23, 1988 <br />Reference: Anoka Sports CeAter, Ramsey, MN <br />Page 3 <br />e) . natural C lar, - An underground natural gas service extended to the building <br />will be supplied by the serving utility. <br />c . M <br />The exterior architectural design of the project will utilize painted, rock <br />face concrete block with clear insulated glass window units set in architec- <br />turally finished clear anodized aluminum frames. One pair of slimline alu- <br />minum and glass entrance doors will be provided along the sports center west <br />side. Exterior operable windows will be provided for the office areas. All <br />windows and doors will be 1" thick tempered, clear insulated glass units. <br />Three supplementary exterior service exits will be provided for the sports <br />center and one supplementary exterior service exit will be provided for the <br />storage building. One 8' -0" wide pair of doors will be provided for access <br />to the display area. Exterior exits will be insulated hollow metal doors <br />set in hollow metal frames. In addition, two painted overhead garage doors <br />with steel bumper posts will be provided for the sports center and one <br />painted overhead garage door with steel bumper posts will be provided for <br />the storage building. A 6' high chain link fence will be provided around <br />the exterior storage area located between the buildings and will include one <br />15' wide rolling.gate with four steel bumper posts protecting the gate open- <br />ing. <br />4. G-ne,- 1 F <br />A one -story sports center and storage building of approximately 10,500 sq. <br />It. and 4,000 sq. ft., respectively, will be constructed. The sports center <br />will support two spans of open -web bar joists and metal roof deck by means <br />of 12" concrete block bearing walls in conjunction with steel lintels and <br />columns along display areas and a steel beam and colon line running in the <br />east - direction. Two 35 x 150' bays will be created providing a nomi- <br />nal 12' clear height from floor to bar joists with a roof slope of 4" to <br />the center of the building. The storage building will support single span <br />open -web bar joists and metal roof deck by means of 12" concrete block <br />bearing walls. The building will be provided with a nominal clear height of <br />approxi�-retely 12' from floor to bar joists with a roof slope of 8" to the ea <br />The building envelope (walls and. roof) will be insulated to conform to the <br />U -value prescribed by the current Minnesota Energy Conservation Legislation. <br />The values are .06 for roofs and .238 (average for exterior walls including <br />glazed areas) . All exterior concrete block walls for both buildings will be <br />insulated with Polystyrene bead core fill insulation above grade and rigid <br />polystyrene insulation below grade. A 3--p1y built -up fiberglass felt, <br />asphalt and travel roof surface over two lavers of insulation will be pro- <br />vided for both buildings. r11 exterior flashing and fascia will be painted <br />galvanized sheetmetal. Roof drainage for the sports center will be <br />accomplished by two interior roof drains plu^b°d to ground level at the <br />north side of the building. Roof drainage for the storage building will be <br />accomplished by two exterior scuppers with dow:.spouts. A two year roofer's <br />guarantee on all roofing work and flashing will be furnished. <br />161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.