Laserfiche WebLink
March 23 1988 <br />Reference: Anoka Sports Center, Ramsey,, MN <br />Page 8 <br />j) . The service bay will be provided with a 600 cfm overhead exhaust <br />system for gasoline <br />vented tthroughtheeroofcexc ductwork and <br />hoses <br />exhaust b $ 1,200.00 <br />for an additional. . . . . . . . • • . <br />k). The service bay will be provided with a 400 cfm make -up air .$ 7,720.00 <br />and ventilation system for an additional. . <br />l). Five 12' strips of track lighting with thirty 150 watt fixtures .$ 0 <br />will be provided for an additional. . . • • • • • 0 <br />[ 1,620.0 <br />14. Ali-e to for Tax 7ncremPn* F i i n inq. <br />The City of Ramsey Engineer and Planning Administrator have stated that <br />construction costs the city will include and support under th i ir r d ta li ncre- <br />ment financing program include clearing grubbing, g rading <br />Class 5 gravel fill, soil correction, storm sewer, curb and gutter, exterior <br />lighting, landscaping (sod, trees and parawing)for <br />TIFznanced <br />City of Ramsey will provide all design 9 s <br />Estimated construction costs for each item are; <br />a). <br />Clearing and.grubbing. . . . . . <br />. . . .$ <br />$ <br />6,970.00 <br />13,950.00 <br />b). <br />Grading and fill. <br />. <br />6,030.00 <br />c). <br />Class 5 gravel fill. • <br />.$ <br />.$ <br />2,335.00 <br />d). <br />Storm sewer. . . . . . . . . <br />.$ <br />5,480.00 <br />e) . <br />Curb and gutter. . <br />.$ <br />7,790.00 <br />f). <br />Exterior lighting. <br />..$ <br />10,000.00 <br />g). <br />Landscaping. • <br />.$ <br />S 500.00 <br />, <br />h). <br />Lawn irrigation. <br />$ <br />8,165.00 <br />i). <br />General conditions. . . • • . ' <br />' <br />. . $ <br />1 280.00 <br />j) . <br />Plumbing . . . . . . . . . . . . . <br />. <br />rr G��7TT $67,500 <br />LT <br />15. &hzi l a . <br />Y drawings in conjunction with the City <br />Anticipating authorization to working <br />Engineer beginning site and grading plans by April 15, 1988, we could pro- <br />vide a firm price proposal by May 15, 1988 and begin construction as e a rly <br />as June 1, 1988. A continuous construction schedule of 16 weeks will be <br />required to complete the building for occupan cy by late Septeer, 1988• <br />t the facility of this preliminary <br />Stiglich Construction, Inc. will cons.ruc� <br />proposal excluding all alternates with a progress pa�yme -nt contract for a <br />contract amount of $406,500.00 to $426,500.00. <br />IIA <br />