My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 08/08/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:47:52 PM
Creation date
8/4/2006 2:22:32 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/08/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-364- <br />BOL -TON 8g- M i N K, I N G_ <br />Consulting Engineers & Surveyors <br />NAU Building • 7333 Sunwood Drive • Ramsey, MN 55303 <br />Phone (763) 433 -2851 • FAX (763) 427 -0833 <br />Bids for the above referenced project were received on August 1, 2006. <br />Two bids were received for the construction of Well No. 7 and Well No. 8. Bids were received <br />from E.H. Renner & Sons and Traut Wells. We have worked with both contractors previously <br />and are confident both are responsible bidders. <br />The Engineers' Estimate for the project is $380,000 for Well No. 7, $350,000 for Well No. 8, <br />with a total project estimate of $730,000. The low bid of $711,822.00 submitted by E.H. Renner <br />& Sons is approximately 2:5% below the Engineers' Estimate. Traut Wells bid of $761,875.00 <br />is within 7% of the low bid. <br />The specifications and bid documents did not contain any wording or ambiguities so as to force <br />the Contractor to build in additional contingencies. Therefore, we feel that the bids received were <br />competitive and responsive and rebidding of the project would not provide any cost savings. <br />We have worked with E.H. Renner & Sons on a number of wells during the past 7 years. We <br />have worked with them in the past for the City of Ramsey, Minnesota and the projects had <br />positive outcomes. All of the projects we have been involved in with E.H. Renner & Sons have <br />been successfully completed in a timely and professional manner. <br />E.H. Renner & Sons is experienced in the type of work required for this project and has fulfilled <br />the bidding and contract requirements. Therefore, we recommend the bid from E. H. Renner & <br />Sons be accepted. <br />Respectfully submitted, <br />BO <br />EVALUATION OF BIDS FOR THE CITY OF RAMSEY, MINNESOTA <br />MUNICIPAL WELL NO. 7 AND 8 <br />K, INC. <br />Paul Saffe , .E. <br />Project Manager <br />M: \BMI Forms \BMI Itr -hd EMAIL.doc <br />MANKATO, MN • FAIRMONT, MN • SLEEPY EYE, MN • BURNSVILLE, MN •WILLMAR, MN • RAMSEY, MN ••CHASKA, MN • AMES, IA <br />. www.bolton- menk.com <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.