Laserfiche WebLink
<br />The Finance Department has been trained in payroll, accounts payable, general ledger and soon <br />cash receipting/accounts receivable. It is anticipated that we will prepare the next payroll on the <br />new system. We have been inputting payroll after-the-fact since the end of September so that we <br />were sure the correct processes were taking place and so that we had a clean quarterly cut-off. <br />We would like to try and run the next accounts payable batch parallel on the new system. <br /> <br />It is planned that all systems will be operational and running by the end of the year, with the <br />exception of the permit system which will be done early in 1996. While this is a bit later than I <br />had hoped, it has been beneficial to not rush any of the processes so that all have a good <br />understanding. <br /> <br />The last step for the Police Department computerization is the connection of their new PC's to <br />the existing TI990 which allows the connection to the State system. This should take place <br />within the next two weeks as it requires coordination with MASYS and our computer <br />consultants. All security measures have been taken to guarantee that information that should be <br />accessed by only police personnel will indeed only be accessible by them through only the <br />machines located in the Police Department. <br /> <br />We are still monitoring the budget closely and anticipate the addition of one more PC for the <br />permits module and a laptop for the Police Department prior to year-end. <br /> <br />Sale of Sm:plus Property <br /> <br />Recently the City Council authorized the sale of surplus property. We recently advertised and <br />opened bids on the surplus vehicles that we had due to replacement and rotations of the fleet. <br />We had placed minimum bids on the vehicles and based on the minimums should have <br />recognized sale proceeds of $5,500.00. We received at least two bids on each vehicle and all <br />bids received were at or above the established minimum values. After the bids were opened and <br />tallied, we realized proceeds of $8,109.77 which is approximately $2,600.00 more than <br />anticipated. The proceeds will be placed in the Equipment Replacement Fund. <br />