Laserfiche WebLink
<br />~ <br /> <br />CASE # t &l.. <br />CHANGE ORDER FOR IMPROVEMENT PROJECT #95-18 <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />There was a minor change to Project #95-18, the extension of water and sewer to River Plaza/47 <br />Addition. The original plan called for extending a sanitary sewer to the south side of the entrance <br />to the River's Bend shopping center. This would cause some degree of traffic disruption during <br />the excavation and continued inconvenience during the period between the excavation and final <br />bituminous patching. To avoid this, the manhole was moved to the north side of the drive. The <br />change order is for the cost of the precast manhole base. This cost change will offset by a reduced <br />length of sewer pipe and from the elimination of restoration of the selVice drive. <br /> <br />Staff Recommendation: <br /> <br />Approve Change Order for Improvement Project #95-18 in the amount of $648.14. <br />Committee Action: <br /> <br />Motion to recommend Council approval of Change Order #1 for Improvement Project #95-18 in <br />the amount of $648.14. <br /> <br />Reviewed by: <br />City Engineer <br />R&B: 11/28/95 <br />/jrnk: <br />