My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/01/1997
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1997
>
Agenda - Planning Commission - 07/01/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:06:23 AM
Creation date
8/18/2006 3:30:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/01/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i ' <br /> <br />The Director may impose reasonable conditions upon the issuance of the Permit and the <br />performance of the Applicant thereunder in order to protect the public health, safety and welfare, <br />to ensure the structural integrity of the Right-of-Way, to protect the property and safety of other <br />users of the Right-of-Way, and to minimize the disruption and inconvenience to the traveling <br />public. <br /> <br />Sec. 2.06. Permit Fees <br /> <br />(a) Excavation Permit Fee. The Excavation Permit Fee shall be established by the <br />Director in an amount sufficient to recover the following costs: <br /> <br />(I) the City Cost; <br /> <br />(2) the Disruptive Cost; <br /> <br />(3) the cost of creating and maintaining a mapping system; <br /> <br />(4) the Degradation of the Right-of-Way that will result from the Excavation <br />to take place thereon; and <br /> <br />(5) Restoration, if done by the City. <br /> <br />(b) Obstructional Permit Fee. The Obstruction Permit Fee shall be established by the <br />Director and shall be in an amount sufficient to recover the following costs: <br /> <br />(l) the City Cost; <br /> <br />(2) the Disruptive Cost; and <br /> <br />(3) the cost of creating and maintaining a mapping system. <br /> <br />(c) System Management Permit Fee. -The System Management Permit Fee for high <br />intensity corridors shall be established by the Director in an amount sufficient to recover the City <br />Cost for planning, designing, constructing and maintaining the high intensity corridors. <br /> <br />(d) Payment of Permit Fees. No Excavation Permit or Obstruction Permit shall be issued <br />without payment of such fees before the issuance of such a Permit unless the Applicant shall <br />agree to pay such fees within thirty (30) days of billing therefor. <br /> <br />(e) Computation of Disruptive Cost. The Director shall determine the Disruptive Cost <br />component of the fees for Excavation and Obstruction by using economic and accounting <br />principles. Fees may vary from one location to another based on the size of the area to be <br />Obstructed, the duration that the Right-of- Way or parts of it will be unavailable for public use <br /> <br />18 <br /> <br />72., <br />
The URL can be used to link to this page
Your browser does not support the video tag.