Laserfiche WebLink
<br />~ <br /> <br />page 2 <br /> <br />f{I~:(:B.:fVE.:t) <br />!-lUG 1 4 1997 <br />I BY:_ <br /> <br />(12) United Power Association and Northern St~tes <br />Power transmission lines cross on northeast <br />corner of work area. <br /> <br />:,fj.). ~ <br /> <br />(13) Natural Gas pipeline in ditch along 181st Ave. <br />over 1/4 mile from excavation. <br /> <br />8. All equipment used in excavation to be stored in <br />40' x 100' building in off season. <br /> <br />9. All equipment is modern and well maintained. The <br />large pieces will be a D5 dozer with 12'push blade <br />and 2 Unit draglines, one with a 50' boom, the other <br />with a 45' boom. <br /> <br />10. Enclosed is a drainage plan showing elevations from <br />181st Ave. to the south border. The entire body <br />surrounding the work area is higher elevation. <br />The land gently rolls and drains toward the proposed <br />pond area. <br /> <br />11. All trucks will be using the designated hauling road <br />through the middle of the farm. This area has been <br />an old lane and private road for years. The end of <br />this road is on top of a hill on 181st Ave, affording <br />good visibility for trucks entering or leaving <br />property. Also at the end of the road is the <br />junction of Burns Township road, Rabbit Street. Most <br />trucks hauling will be using Cty 64 going west. <br /> <br />12. The sale of this topsoil will not be open to public. <br />Several contractors have contracted for all dirt <br />removal. The hours of dirt removal by contractors <br />will be from 7 A.M.-5 P.M. Monday - Friday, Sat 7-3. <br /> <br />13. All dirt being excavated will be deposited in <br />rows not exceeding 25' in height. This dirt <br />will be dozed into a pile where it will be <br />loaded into trucks and hauled away on the <br />designated road. <br /> <br />14. The pond excavation will- start in the fall-of '97. <br />The first year will be spent primarily preparing <br />the site for dirt removal with approx. 2 acres dug. <br />In the next two years, the project will speed up and <br />hopefully we can dig four acres per year. Each acre <br />of dirt will yield about 9,500 yards of material. The <br />average depth of the pond will be around 6' with a <br />gradual pitch from the shore. The estimated size of <br />pond will be around twelve acres. <br /> <br />~ <br /> <br />? o~ t.t <br />