My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 09/02/1997
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1997
>
Agenda - Planning Commission - 09/02/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:06:50 AM
Creation date
8/18/2006 3:45:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
09/02/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />Rf?;c__; F: t V},::.: F) <br /> <br />page 3 <br /> <br />AUG 1 4 1997 <br />I BY: <br />. --_. ~-=-==:--. <br /> <br />15. Sequence of Pond Excavation: <br />(see attached diagram) <br /> <br />A. Doze path on north side of the ditch and install <br />the silt fence. Push debris east onto high <br />ground. <br /> <br />B. Dose clearing on west perimeter and install silt <br />fence. Push excess debris north to high ground. <br /> <br />C. Clear 100' wide strip on west side in Row 1 area. <br />Pile brush and debris in piles on north side of <br />pond area on high ground. <br /> <br />D. Start dirt excavation on northwest corner and <br />proceed to southwest corner by use of dragline. <br />Deposit dirt in north and south row to maximum <br />of 25' in height. <br /> <br />E. Push dirt from row into pile on north end and load <br />onto trucks. <br /> <br />F. Proceed on clearing area in Row 2 and continue to <br />dragline dig pond. <br /> <br />G. Continue same in Row 3-5 clearing and digging. <br /> <br />H. Throughout excavation, doze brush and debris piles <br />to stimulate mulching of brush. <br /> <br />16. I feel that doing the work myself is an asset as I <br />will not have to rely on independent contractors to <br />help maintain a neat work environment or leave an <br />eyesore at completion of project. To complete the <br />project I plan on establishing new grass and planting <br />new trees from existing tree plots, leaving the pond <br />in natural foliage. Wildlife habitat will be planted <br />and landscaped to water edge. <br /> <br />~ <br /> <br />'3 ,-,c..~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.