Laserfiche WebLink
<br />~ <br /> <br />CITY COUNCIL WORK SESSION <br />Topic Report: Review Fire Station #2 <br />Replacement Options <br />By: Dean Kapler, Fire Chief <br /> <br /> <br />Background: <br /> <br />As Council is aware, in early 2006, staff was directed to contract the BKV Group to <br />determine the feasibility of three options to house a workIng fire station until a new <br />station could be built. Utilizing some or all of the existing police building can be <br />incorporated into each of the following options. <br /> <br />Option 1. <br />Utilize existing spaces used by fire department and vacate city hall portion. Repair, <br />updating, and replacement of building components would be required. Goal is to use for <br />5 - 10 years. <br /> <br />Option 2. <br />Demolish the City Hall portion, reroute/relocate existing systems and/or provide new <br />systems to serve the remaining spaces used as fire station. <br /> <br />Option 3. <br />Completely demolish existing building. A new fire station would be built on the <br />designated site. With Option #3, the existing building would have to be used until the <br />new structure was ready for occupation. <br /> <br />The replacement study is being sent out with Council's packet for review. Staff also has <br />had a chance to review the study. Ted Redmond of BKV will be present at the work <br />session for input. <br /> <br />Action Statement: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br /> <br />Fire Chief <br />City Administrator <br /> <br />CCWS: <br /> <br />08/08/06 <br />