My WebLink
|
Help
|
About
|
Sign Out
Home
1994 Working Papers
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1993 (Incompleted)
>
1994 Working Papers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 8:26:57 AM
Creation date
9/14/2006 8:22:00 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />~ <br /> <br />Economic Development Commission <br />October 20, 1994 <br />Page 3 <br /> <br />Land cost estimates have been prepared. The westerly alignment is estimated to require <br />26.6 acres at $1,000,600 (1994 $). The easterly alignment is estimated to require 10.14 <br />acres at $398,000 (1994 $). <br /> <br />While the cost differences are significant, it is too early for cost to be a consideration in <br />the selection of an alternative. Instead, land use, ease of transportation, reduction of <br />traffic on Highway 10, and traffic impacts on City streets should be considered. <br /> <br />6. We need a count of houses impacted by the westerly bridge alignment as well as the <br />number of houses impacted by the eastern bridge alignment. <br /> <br />Residential land uses would not be impacted by either alignment alternative. <br /> <br />7. We should seriously consider input by a recognized road planner. Is Mn/DOT the <br />authority ? <br /> <br />See answer to question 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.