My WebLink
|
Help
|
About
|
Sign Out
Home
1994 Working Papers
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1993 (Incompleted)
>
1994 Working Papers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 8:26:57 AM
Creation date
9/14/2006 8:22:00 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.t <br /> <br />and resulted in zoning and subdivision regulations for <br />controlling new residential and commercial development. <br /> <br />Throughout the 1980's, the City of Ramsey continued to experience <br />above-average residential growth. until 1985, much of this <br />residential development occurred throughout the City as large-lot <br />residential developments without the benefit of municipal <br />sanitary sewer and water services. In 1985, the southeastern <br />part of the City received central sanitary sewer. <br /> <br />In 1980, the City prepared its comprehensive plan in response to <br />the Metropolitan Land Planning Act of 1976. This Act required <br />all local governments in the Twin cities Metropolitan Area to <br />prepare a comprehensive plan. Since 1980, the City has prepared <br />several amendments to its original plan. The purpose of these <br />plan amendments has been for the most part to amend its urban <br />service area in response to continued residential development <br />pressure. In addition, however, the City developed four distinct <br />development areas as part of its 1990 plan amendment. These four <br />districts included the following: <br /> <br />1. Metropolitan Urban Service Area, where the City commits to <br />supporting and encouraging growth and development in this <br />development district by providing public services and <br />facilities. <br /> <br />2. Urban Reserve Area, is the area between the MUSA and the <br />city's designated urban area boundary. This is the area <br />where future MUSA expansions will logically occur. The City <br />committed to preserving this area for the orderly and <br />economic expansion of urban services. <br /> <br />3. Rural Transition Area, is the area abutting the urban <br />reserve area and is predominantly one to two and a half <br />(2.5) acre residential lots. It is not anticipated that <br />sanitary sewer will be extend to this area for the <br />foreseeable future. <br /> <br />4. Rural service Area, is the remainder of the City. This area <br />provides for long term, large lot (1 unit per 10 acres) <br />residential use and agricultural or open space areas. <br /> <br />Working Paper #1 <br />City of Ramsey Comprehensive Plan Update <br />Land Use Element <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.