My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 12/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:40:15 AM
Creation date
12/10/2024 1:32:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />40 <br />80 <br />SCALE FEET <br />/ <br />%,- <br />- �� <br />ti <br />\V _ s`10 CU YD - RIP RAP CL III <br />- <br />��f- U j <br />/14 9P�� v` <br />\ <br />/ / TOPSOIL STOCKPILE LOCATION \ <br />/ / / PROTECT STOCKPILE <br />/ <br />I HEREBY CERTIFY THAT THI S PLAN, SPECIFICATION, OR REPORT WAS PREPARED <br />BY ME OR UNDER MY DIRECT SUPERVMON AND THAT I AM A DULY LICENSED <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA <br />— J <br />EVIN P. KIELB <br />LIC <br />0 23211 <br />DATE <br />8/20/2024 <br />\QA <br />\\VA <br />\/> <br />\o , <br />Ar <br />BOLTON <br />& MENK <br />F&I <br />10 CU YD - RIP RAP CL III <br />2000YD- RIP RAP CLIII <br />7533 SU N WOOD DR NW, SUITE 206 <br />RAMSEY, MN 55303 <br />Phone: (763) 433-2851 <br />Email: Ramsey@ bolton-menk.com <br />www.bolton-menk.com <br />i <br />DELINEATED WETLAND <br />DESIGNED ZFL <br />DRAWN TJH <br />F&I <br />III - <br />N, <br />II \ <br />7 CU YD - RIP RAP CL III / <br />/ r <br />i <br />NO <br />ISSUED FOR <br />DATE <br />RUM RIVER FLOOD PLAIN <br />CHECKED KPK <br />EROSION CONTROL LEGEND <br />MS - <br />EXISTING DRAINAGE FLOW <br />STORM DRAIN <br />INLET PROTECTION <br />SILT FENCE - MACHINE SLICED <br />RIP RAP CLASS III <br />PROPOSED DRAINAGE FLOW <br />ROLLED EROSION <br />PREVENTION CATEGORY 20 <br />AND SEED MIX 35-241 <br />HYDRAULIC BONDED FIBER <br />MATRIX <br />STABILIZED CONSTRICTION EXIT <br />NOTES: <br />1. ALL CATCH BASINS AND INLETS, BOTH EXISTING AND PROPOSED, <br />SHALL HAVE INLET PROTECTION INSTALLED PRIOR TO DISTURBANCE <br />AND REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED. <br />2. CONSTRUCT STABILIZED CONSTRUCTION EXITS AS NECESSARY <br />THROUGHOUT THE PROJECT. <br />3. QUANTITY FOR INLET PROTECTION IS BASED ON INLET PROTECTION <br />NEEDED FOR EACH STRUCTURE DURING THE COURSE OF THE PROJECT. <br />4. ONCE STARTED, STORM SEWER AND GRADING ACTIVITIES SHALL BE <br />EXECUTED DILIGENTLY AND CONTINUOUSLY UNTIL COMPLETE. <br />5. PLACE 4" OF TOPSOIL IN OFF STREET GREEN SPACE. <br />6. THE CONTRACTOR SHALL USE ONSITE TOPSOIL STOCKPILE FOR <br />TOPSOIL INSTALLATION. NO TOPSOIL SHALL BE IMPORTED WITHOUT <br />APPROVAL FROM THE ENGINEER. <br />7. STABILIZE TOPSOIL STOCKPILE WITH HYDRAULIC BONDED FIBER <br />MATRIX AT THE DIRECTION OF THE ENGINEER IN THE FIELD. <br />CITY OF RAMSEY, MINNESOTA <br />RIVERS BEND REGIONAL STORMWATER IMPROVEMENTS <br />CLIENTCP 25-01 <br />PRO1 NO <br />EROSION CONTROL & TURF ESTABLISHMENT <br />SHEET <br />7 <br />OF <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.