SW PPP_1_PROJ_INFO_MAP dwg 8/20/2024 4 06 29 PM <br />STORMWATER <br />POLLUTION PREVENTION <br />PLAN (SWPPP) <br />Rivers Bend Pond -2024 <br />CITY OF Ramsey <br />Anoka COUNTY, MINNESOTA <br />PROJECT LOCATION <br />RESPONSIBLE PARTIES: <br />The Contractor and Owner will be joint applicants under the MPCA's General Stormwater Permit for Construction Activity as required <br />by the National Pollutant Discharge Elimination System (NPDES) Phase II program. <br />The Contractor shall provide one or more trained Construction SWPPP Manager(s) knowledgeable and experienced in the application <br />of erosion prevention and sediment control BMPs that will oversee the implementation of the SWPPP, and the installation, inspection <br />and maintenance of the erosion prevention and sediment control BMPs. <br />A Construction SWPPP Manager must be available for an on -site inspection within 72 hours upon request by the MPCA. <br />COMPANY <br />CONTACT PERSON <br />PHONE <br />OWNER: <br />City of Ramsey <br />Bruce Westby, PE <br />763-433-9825 <br />SWPPP DESIGNER: <br />Bolton & Menk, Inc. <br />Timothy Haugo <br />763-433-2851 <br />CONTRACTOR: <br />TBD <br />TBD <br />TBD <br />CONSTRUCTION SWPPP MANAGER: <br />TBD <br />TBD <br />TBD <br />PARTY RESPONSIBLE FOR LONG TERM O&M: <br />City of Ramsey <br />Bruce Westby, PE <br />763-433-9825 <br />The SWPPP Designer, Construction SWPPP Manager, and BMP Installer must have appropriate training. Documentation showing <br />training commensurate with the job duties and responsibilities is required to be included in the SWPPP prior to any work beginning on <br />the site. Training documentation for the SWPPP Designer is included on the Narrative sheet. The Contractor shall attach training <br />documentation to this SWPPP for the Construction SWPPP Manager and BMP Installer prior to the start of construction. This <br />information shall be kept up to date until the project NOT is filed. <br />ADDITIONAL COMPENSATION <br />Payment for all work associated with Erosion and Sediment Control shall be as described in the Project Manual. Unless otherwise <br />authorized by the Owner no additional payment shall be made for any work required to administer and maintain the site erosion and <br />sediment control in compliance with the Minnesota Pollution Control Agency (MPCA) - General Stormwater Permit for Construction <br />Activity (MN R100001) including but not limited to inspection, maintenance, and removal of BMPs or addition of BMPs to <br />accommodate Contractor phasing. <br />DOCUMENT RETENTION <br />Permittees must make the SWPPP, including all inspection reports, maintenance records, training records and other information <br />required by this permit, available to federal, state, and local officials within three (3) days upon request for the duration of the permit <br />and for three (3) years following the NOT. <br />GENERAL STORMWATER DISCHARGE REQUIREMENTS <br />All requirements listed in Section 5.1 of the Permit for the design of the permanent stormwater management system and discharge <br />have been included in the preparation of this SWPPP. These include but are not limited to: <br />1. The expected amount, frequency, intensity, and duration of precipitation. <br />2. The nature of stormwater runoff and run-on at the site <br />3. Peak flow rates and stormwater volumes to minimize erosion at outlets and downstream channel and stream bank erosion. <br />4. The range of soil particle sizes expected to be present on the site. <br />Permanent stormwater treatment systems for this project have been designed in accordance with the guidance in the MN Stormwater <br />Manual in place at the time of bidding. Copies of the design information and calculations are part of this SWPPP and will be provided in <br />digital format upon written request to the Engineer. <br />LEGEND <br />PROJECT AREAS: <br />Total Project Size (disturbed area), <br />Existing area of impervious surface = <br />Post construction area of impervious surface = <br />Total new impervious surface area created = <br />PROJECT LOCATION <br />1-MILE BOUNDARY <br />IMPAIRED, SPECIAL OR PROTECTED WATERS <br />NATIONAL WETLANDS INVENTORY <br />RECEIVING WATERS <br />2.8 <br />0 <br />0 <br />0 <br />Planned Construction Start Date: 9/15/2024 <br />Estimated Construction Completion Date: 11/15/2024 <br />ACRES <br />ACRES <br />ACRES <br />ACRES <br />PERMANENT STORMWATER MANAGEMENT SYSTEM: <br />Type of storm water management used if more than 1 acre of new impervious surface is created: <br />1 <br />Wet Sedimentation Basin <br />Infiltration/Filtration <br />Regional Pond <br />Permanent Stormwater Management Not Required <br />PROJECT LOCATION: <br />COUNTY <br />TOWNSHIP <br />RANGE <br />SECTION <br />LATITUDE <br />LONGITUDE <br />ANOKA <br />T32N <br />R25W <br />25 <br />45.22821° <br />-93.39473° <br />BMP SUMMARY <br />QUANTITY <br />UNIT <br />STORM DRAIN INLET PROTECTION <br />5 <br />EACH <br />ROLLED EROSION PREVENTION CATEGORY 20 <br />8,500 <br />SQYD <br />SEEDING MIXTURE 35-241 <br />70 <br />POUND <br />SILT FENCE MACHINE SLICED <br />1,800 <br />LIN FT <br />RIP RAP CLASS III <br />50 <br />CU YD <br />STABILIZED CONSTRUCTION EXIT <br />1 <br />EACH <br />DESCRIPTION OF CONSTRUCTION ACTIVITIES AND STORMWATER MANAGEMENT: <br />Construction activities include: Site grading, sanitary sewer and water main extensions, temporary <br />erosion and sediment control, and permanent stabilization. <br />Storm water currently from the urbanized and undeveloped area is currently being routed to catch basins <br />located along 142nd Ave NW and Xkimo St. NW and flow through storm drains into an existing pond <br />located within Rivers Band park. The existing pond is located south of 142nd Ave NW and Waco st. NW <br />intersection. The outlet of the pond is Rum River. The current pond size is in adequate to treat the current <br />impervious area. <br />After construction is complete storm water will be managed in a different pond area. The water will be <br />routed through the catch basins located on 142nnd Ave. NW and Xkimo ST. NW and then routed through <br />storm drains to the new biofiltration pond. First entering a wet sedimentation basin with a capacity of <br />74,000 cubic feet, 5 feet deep, then entering the biofiltration basin. The pond will have a treatment <br />capacity of 148,795 cubic feet. <br />This project includes the following stormwater management BMPs: Biofiltration and wet sedimentation. <br />1-MILE <br />!BOUNDARY <br />J <br />ti <br />s 4� PROJECT <br />Gr11 I LOCATION <br />RECEIVING <br />WATERS <br />1500 <br />3000 <br />SCALE <br />FEET <br />RECEIVING WATERS: <br />Receiving waters, including surface water, wetlands, Public Waters, and stormwater ponds, within 1-mile of the project boundary are identified on the <br />USGS 7.5 min quad map above. Receiving waters that are impaired, the impairment, and WLA are listed as follows. All specific BMPs relative to <br />construction activities listed in the permit for special prohibited, restricted, or impaired have been incorporated into this plan. All specific BMPs listed in <br />approved TMDLs and those BMPs listed for construction related waste load allocations have also been incorporated. <br />NAME OF WATER BODY <br />TYPE (ditch, pond, <br />wetland, lake, etc.) <br />Special, Prohibited, <br />Restricted Water <br />Flows to Impaired <br />Water Within 1-Mile 2 <br />USEPA Approved <br />Construction Related <br />TMDL3 <br />Rum River <br />River <br />Nutrients <br />Yes <br />NaN <br />'Special, prohibited, and restricted waters are listed in Section 23 of the MN Construction Stormwater General Permit (MNR100001). <br />2 Identified as impaired under section 303 (d) of the federal Clean Water Act for phosphorus, turbidity, TSS, dissolved oxygen, and/or aquatic biota. <br />3 Construction Related TMDLs include those related to: phosphorus, turbidity, TSS, dissolved oxygen, and/or aquatic biota. <br />IMPLEMENTATION SCHEDULE AND PHASING: The Contractor is required to provide an updated schedule and site management plan <br />meeting the minimum requirements of Section 1717 of the Minnesota Standard Specifications for Construction. <br />1) Submit SWPPP Updates to Engineer. Submittal shall include any requested changes to the SWPPP, including but not limited to: <br />Trained Personnel, Locations for Stockpiles, Concrete Washout, Sanitation Facilities, Types and Locations of Erosion & <br />Sediment Control. Failure to submit updates shall be considered acceptance of the SWPPP as designed with no changes. <br />2) Install perimeter sediment control, inlet protection, and construction exit. <br />3) Complete Site Grading. <br />4) Add additional temporary BMPs as necessary during construction based on inspection reports. <br />5) Ensure final stabilization measures are complete. <br />6) Provide digital copy of all Field SWPPP Documentation including Inspection Reports and SWPPP Revisions to the Owner. <br />7) Submit Notice of Termination (NOT) to MPCA. NOTE: The NOT must be submitted to MPCA before Final Stabilization is <br />considered complete. <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED <br />BY ME OR UNDER MY DIRECT SUPERVMON AND THAT I AM A DULY LICENSED <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA <br />Zw <br />KEVIN P. KIELB <br />uc No 23211 DATE 8/20/2024 <br />BOLTON <br />& MENK <br />7533 SU N WOOD DR NW, SUITE 206 <br />RAMSEY, MN 55303 <br />Phone: (763) 433-2851 <br />Email: Ramsey@bolton-menk.com <br />www.bolton-menk.com <br />DESIGNED ZFL <br />NO <br />ISSUED FOR <br />DATE <br />DRAWN TJH <br />CITY OF RAMSEY, MINNESOTA <br />CHECKED KPK <br />RIVERS BEND REGIONAL STORMWATER IMPROVEMENTS <br />CLIENTCP 25-01 <br />PRO1 NO <br />STORM WATER POLLUTION PREVENTION PLAN <br />SHEET <br />8 <br />OF <br />12 <br />