My WebLink
|
Help
|
About
|
Sign Out
Home
MUSA Boundary Changes
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1980-1989
>
1989
>
MUSA Boundary Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 1:17:43 PM
Creation date
9/14/2006 1:41:32 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. The distribution pipes shall connect to the outlets <br />of a distribution box. <br />16. The quantity of effluent per pump dose shall be at least <br />one hundred fifty (150) gallons per bedroom for dwellings. For <br />other establishments, the dose shall be at least twenty -five per <br />cent (25%) of the estimated or measured daily sewage flow. <br />17. At least two (2) inches of filter material shall be <br />placed over the lateral or distribution pipes. <br />18. Straw or marsh hay to an uncompacted depth of three (3) <br />to four (4) inches shall be placed over the filter material. <br />19. Construction vehicles shall not be allowed on the filter <br />material until backfill is placed. <br />20. Sandy loam soil shall be placed on the filter material <br />to a depth of one (1) foot in the center of the mound and to a <br />depth of six (6) inches at the sides. <br />21. A maximum of two (2) ten (10) foot wide beds may be <br />installed side by side in a signle mound if the soil percolation <br />rate is between five (5) and sixty (60) minutes per inch to a <br />depth of at least twenty -four (24) inches below the sand layer. <br />The beds shall be separated by four (4) feet of sand. <br />22. When two (2) beds are installed side by side, the sandy <br />loam fill at the center of the mound shall be eighteen (18) <br />inches deep and six (6) inches deep at the sides. <br />23. Six (6) inches of topsoil shall be placed on the fill <br />material over the entire area of the mound. <br />24. A vegetative cover shall be established over the entire <br />area of the mound. <br />25. No shrubs shall be planted on the top of the mound. <br />Shrubs may be placed at the foot and side slopes of the mound. <br />26. The side slopes on the mound shall be no steeper than <br />three (3) to one (1). <br />27. Whenever mounds are located on <br />be constructed immediately upslope from <br />and direct runoff. <br />28. Whenever mounds are located on <br />be constructed immediately upslope from <br />and direct runoff. <br />1990 URBAN SERVICE AREA ALTERNATIVE <br />slopes, a diversion shall <br />the mound to intercept <br />slopes, a diversion shall <br />the mound to intercept <br />
The URL can be used to link to this page
Your browser does not support the video tag.