Laserfiche WebLink
15. Distribution of effluent over the filter material shall <br />be one and one- fourth (1 -1/4) inch diameter perforated pipe under <br />pressure from a manifold. <br />16. The quantity of effluent per pump dose shall be at least <br />one hundred fifty (150) gallons per bedroom for dwellings. For <br />other establishments, the dose shall be at least twenty -five per <br />cent (25 %) of the estimated or measured daily sewage flow. <br />17. At least two (2) inches of filter material shall be <br />placed over the distribution pipes. The top of the filter material <br />shall be level in all directions. <br />18. Straw or marsh hay to an uncompacted depth four (4) <br />inches shall be placed over the filter material. <br />19. Construction vehicles shall not be allowed on the filter <br />material until backfill is placed. <br />20. Sandy loam soil shall be placed on the filter material <br />to a depth of one (1) foot in the center of the mound and to a <br />depth of six (6) inches at the sides. <br />21. A maximum of two (2) ten (10) foot wide beds may be <br />installed side by side in a single mound if the soil percolation <br />rate is between five (5) and sixty (60) minutes per inch to a depth <br />of at least twenty -four (24) inches below the sandy layer. The <br />beds shall be separated by four (4) feet of clean sand. <br />22. When two (2) beds are installed side by side, the sandy <br />loam fill at the center of the mound shall be eighteen (18) inches <br />deep and six (6) inches deep at the sides. <br />23. Six (6) inches shall be placed on the fill material over <br />the entire area of the mound. <br />24. A grass cover shall be established over the entire area <br />of the mound. <br />25. No shrubs shall be planted on the top of the mound. <br />Shrubs may placed at the foot and side slopes of the mound. <br />26. The side slopes on the mound shall be no steeper than <br />three (3) to one (1). <br />27. Whenever mounds are located on slopes, a diversion shall <br />be constructed immediately upslope from the mound to intercept and <br />direct runoff. <br />11 <br />