My WebLink
|
Help
|
About
|
Sign Out
Home
1997 Correspondence
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
2000-2009
>
2001
>
1997 Correspondence
>
1997 Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 1:34:33 PM
Creation date
9/19/2006 11:45:11 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7.0 Seek Approvals <br /> <br />The purpose of this task will be obtain approvals of the Draft Comprehensive Plan and the <br />revised Shoreland and Critical River Area Ordinances from the City and the Metropolitan <br />Council. <br /> <br />Subtasks will include the following: <br /> <br />7.1 Review of the plan and ordinances informally with the Planning Commission, the <br />City Council and the Parks and Recreation Commission. Two meetings are <br />anticipated to review the draft plan. <br /> <br />7.2 The conduct of the formal Planning Commission public hearing in accordance <br />with State Statutes to allow for public review and comment on the draft plan and <br />ordinances. One formal public hearing is anticipated to allow proper review of <br />the draft plan and ordinances by the public. <br /> <br />7.3 Review of the Draft Comprehensive Plan with Metropolitan Council Staff <br />(optional). <br /> <br />7.4 The preparation of revisions to the Comprehensive Plan draft based on public <br />hearing input and Metropolitan Council input. <br /> <br />7.5 Meeting with Staff. One meeting estimated. <br /> <br />8.0 Finalize the Plan and Ordinances <br /> <br />Upon completion of the public hearing process, a recommendation by the Planning <br />Commission, adoption by the City Council, and acceptance by the Metropolitan Council, the <br />final Comprehensive Plan will be completed. The consultant will print a selected number of <br />copies in a quantity and at a price to be negotiated with the City. The plan will be prepared in <br />color. An optional service could include a Comprehensive Plan summary which could be <br />distributed to all residents and businesspersons in the City of Ramsey. All plans and <br />ordinances will be provided in electronic format. <br /> <br />B. SCOPE OF ADDITIONAL SERVICES <br /> <br />The following services have not been authorized by the CITY but are available from the <br />CONSULT ANT upon written authorization by the CITY: <br /> <br />1. Services identified as Optional Services in Paragraph A, Work Plan which may be <br />incorporated into the Work Program within six (6) months of the Contract authorization <br />date. <br /> <br />City of Ramsey Contract/Comprehensive Planning Services <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.