My WebLink
|
Help
|
About
|
Sign Out
Home
1999 Correspondence
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
2000-2009
>
2001
>
1999 Correspondence
>
1999 Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 1:37:45 PM
Creation date
9/19/2006 12:35:13 PM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . " <br /> <br />e <br /> <br />e <br /> <br />4. The City acknowledges conflicts with respect to the Anoka County 2015 Transportation Plan. <br />As of yet these conflicts have yet to be resolved and are explained within the text of the <br />Transportation Element. The conflicts are relative to a potential Mississippi River Bridge <br />Crossing location and realignment of a State Trunk Highway. <br /> <br />5. The majority of work performed on the Comprehensive Plan was completed throughout 1998 <br />and does not reflect 1999 development/redevelopment activities. <br /> <br />By pointing these issues out, we hope that we can facilitate the timely review of the City of <br />Ramsey's Comprehensive Plan. Please feel free to contact me at any time should you have any <br />questions or need further information. I can be reached at Ramsey City Hall at 612-427-1410. <br /> <br />Sincerely, <br /> <br /> <br />CITY OF RAM~Y <br />~~ <br /> <br />CC: Hoisington Koegler Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.