|
PLANT SCHEDULE
<br />LANDSCAPE SPECIFICATIONS
<br />SYMBOL
<br />TREES
<br />CODE
<br />QTY
<br />RM 5
<br />FM 6
<br />HB 5
<br />WO 4
<br />BL 5
<br />AE 4
<br />CONIFEROUS TREES
<br />fookikEl
<br />BOTANICAL NAME
<br />Acer rubrum 'Northwood'
<br />Acer x freemanii 'Sienna'
<br />Celtis occidentalis
<br />Quercus bicolor
<br />Tilia americana 'Boulevard'
<br />Ulmus americana 'Princeton'
<br />BF 9 Abies balsamea
<br />BH 6 Picea glauca densata
<br />WP 13 Pinus strobus
<br />ORNAMENTAL TREES
<br />SB 3
<br />GROUND COVERS
<br />COMMON NAME
<br />Northwoods Red Maple
<br />Sienna Glen Maple
<br />Common Hackberry
<br />Swamp White Oak
<br />Boulevard Linden
<br />American Elm
<br />Balsam Fir
<br />Black Hills Spruce
<br />White Pine
<br />SIZE
<br />2" Cal.
<br />2" Cal.
<br />CONTAINER
<br />B&B
<br />B&B
<br />2" Cal. B&B
<br />2" Cal. B&B
<br />2" Cal. B&B
<br />2" Cal. B&B
<br />6' Ht. B&B
<br />6' Ht. B&B
<br />6' Ht. B&B
<br />Amelanchier x grandiflora 'Autumn Brilliance Autumn Brilliance Serviceberry 7' Ht.
<br />Clump Form, 1.5" Cal Equivalent
<br />SOD 25,111 sf Turf Sod Bluegrass
<br />Type II - Native Seed Mix
<br />TII 34,654 sf Refer to notes for acceptable seeding
<br />methods. Seeding Rate 50.0 Ib/ac
<br />OVE
<br />/
<br />A
<br />7
<br />Z/
<br />co
<br />Imo HI
<br />molilloolooll i°II
<br />1111 Imd11 Iul(nlPi°JIIIIf1� �11Va �'
<br />WP
<br />13
<br />SB
<br />3
<br />WO
<br />1
<br />AN MSCA
<br />E
<br />Kentucky Bluegrass
<br />MnDOT Seed Mix 35-241
<br />6' VINYL PRIVACY FENCE
<br />528 LF (BY OTHERS)
<br />BH
<br />6
<br />OUTLOT A :
<br />•
<br />P
<br />AN
<br />•=
<br />•
<br />•
<br />µI' ly
<br />RM
<br />2
<br />sod
<br />seed
<br />•
<br />•
<br />•e,
<br />I11V1Ys1 � uP Vinw,l
<br />• m1o1lllll IIIIIIIII)
<br />•• I ;a�11 vlry
<br />0+ • _0
<br />IF.
<br />fli .JIPI JWh
<br />rrw 1
<br />•
<br />B&B
<br />•
<br />BF
<br />9
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />,WlidYll 1'
<br />•
<br />•
<br />•
<br />ep I iwlV/4 i✓.
<br />PLAN
<br />8" 2-PLY NYLON STRAPS
<br />DOUBLE STRAND 12 GAUGE WIRE
<br />PAINTED FLUORESCENT ORANGE
<br />U I-IITE FLAGGING (TYP.)
<br />TREE WRAP
<br />4 INCI-TES 1-IARDWOOD MULCH
<br />4 INCH DEEP SAUCER
<br />8' STEEL TEE POST-
<br />3 REQUIRED AT 120
<br />BAGKFILL MIX
<br />UNDISTURBED SUBSOIL
<br />REMOVE BURLAP ROPE
<br />FROM TOP 1/3 OF THE BALL
<br />NOTE SEE PLANTING NOTES FOR THE TYPE OF MULCH MATERIAL TO USE.
<br />•
<br />®DECIDUOUS TREE PLANTING DETAIL
<br />NOT TO SCALE
<br />•
<br />/
<br />/
<br />/
<br />/
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />• •• •zo • •• •� • ••• ••_ •• •• •<• •
<br />r' NV Vllµ 1` °r,iNV wt' j__'',"NV Vll,d `� "F�c/V f`IIV"�n•
<br />•
<br />•
<br />•
<br />/
<br />•
<br />•
<br />•
<br />•
<br />•
<br />4
<br />/
<br />uu
<br />cc
<br />• 1
<br />IIIOIOIOIIIUIIIIIIIIIIIOIIIIIIIIIIIIIIIIIIIIIIIIfli''ft��iuuliit lioi II'I
<br />guru' IVIVWI�W,1��,�VIJVWV
<br />in hil)) iiigllllllllllllll,
<br />882.8
<br />882
<br />882.5 G
<br />(879.7
<br />II�
<br />I. SCARIFY BOTTOM AND SIDES OF HOLE
<br />PRIOR TO PLANTING
<br />2. TRIM OUT DEAD WOOD AND WEAK AND/OR
<br />DEFORMED TWIGS. DO NOT CUT A LEADER. DO
<br />NOT PAINT CUTS.
<br />3. SET PLANT ON UNDISTURBED NATIVE SOIL
<br />OR THOROUGHLY COMPACTED BAGKFILL SOIL.
<br />INSTALL PLANT SO THE ROOT FLARE IS AT OR
<br />UP TO 2" ABOVE THE FINISHED GRADE.
<br />4. PLACE PLANT IN PLANTING HOLE WITH
<br />BURLAP AND WIRE BASKET, (IF USED), INTACT.
<br />BAGKFILL WITHIN APPROXIMATELY 12" OF THE
<br />TOP OF ROOTBALL, WATER PLANT. REMOVE
<br />TOP 1/3
<br />OF THE BASKET OR THE TOP TWO
<br />HORIZONTAL RINGS, WHICHEVER IS GREATER[
<br />REMOVE ALL BURLAP AND NAILS FROM TOP
<br />1/3 OF THE BALL. REMOVE ALL TWINE.
<br />5. PLUMB AND BAGKFILL WITH
<br />BAGKFILL SOIL.
<br />6. WATER TO SETTLE PLANTS AND FILL
<br />VOIDS.
<br />1. WATER WITHIN TWO HOURS OF
<br />INSTALLATION. WATERING MUST BE
<br />SUFFICIENT TO THOROUGHLY SATURATE
<br />ROOT BALL AND PLANTING HOLE.
<br />8. PLACE MULCH WITHIN 48 HOURS OF
<br />THE SECOND WATERING UNLESS SOIL
<br />MOISTURE IS EXCESSIVE.
<br />c
<br />NOTE GUY ASSEMBLY OPTIONAL BUT
<br />CONTRACTOR ASSUMES FULL
<br />RESPONSIBILITY FOR MAINTAINING TREE
<br />IN A PLUMB POSITION FOR THE
<br />DURATION OF THE GUARANTEE PERIOD
<br />GUY ASSEMBLY-16'
<br />POLYPROPYLENE OR POLYETHYLENE
<br />(40 MIL) 1-1/2" WIDE STRAP (TYP)
<br />DOUBLE STRAND 10 GA. WIRE, 2-1'
<br />ROLLED STEEL POSTS (MNDOT 3401)
<br />e 180° O.G. (SEE STAKING DIAGRAM)
<br />COORDINATE
<br />STAKING TO INSURE
<br />12 12 UNIFORM
<br />ORIENTATION OF GU
<br />i 120•-- LINES AND STAKES
<br />fl
<br />STAKING DIAGRAM
<br />GUY WIRE WITH WEBBING
<br />FLAGGING- ONE PER WIRE
<br />4"-6' SHREDDED BARK
<br />MULCH
<br />—'—(—EXISTING GRADE
<br />MINIMUM 1/2 WIDTH OF ROOT BALL
<br />'� —PLANTING SOIL MIXTURE (SEE SPEC.)
<br />d,..__ —UNDISTURBED OR STABILIZED
<br />SUBSOIL
<br />CCONIFEROUS TREE PLANTING DETAIL
<br />NOT TO SCALE
<br />11111111111111111111111111111111101,
<br />"IT
<br />11I ��1IIIIIIII1�1I�I1�IIII
<br />pi linen �
<br />1111111111111 ° mll il6B uuwi11111cwoumiiii';I ' N "'
<br />444
<br />•
<br />7
<br />/
<br />/
<br />/
<br />/
<br />/
<br />•,
<br />'•
<br />••
<br />•
<br />•�
<br />•,
<br />•
<br />cob' •
<br />•
<br />•
<br />•
<br />•
<br />• —1•
<br />••
<br />_,
<br />•
<br />••
<br />I
<br />•
<br />•
<br />AE
<br />4
<br />/
<br />I
<br />'°Fq
<br />A'sQ
<br />'Y
<br />HB
<br />5
<br />/
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•
<br />•_
<br />•
<br />•
<br />•
<br />EXISTING
<br />TREES TO
<br />REMAIN
<br />1. UTILITY LOCATES. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND VERIFYING ALL PUBLIC AND
<br />PRIVATE UTILITIES AT LEAST 48 HOURS BEFORE EXCAVATING OR IN ACCORDANCE WITH STATE LAW.
<br />2. PLAN QUANTITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL MATERIAL QUANTITIES PER PLAN.
<br />MATERIAL SCHEDULES ARE PROVIDED SOLELY FOR CONTRACTOR'S CONVENIENCE.
<br />3. TREE PROTECTION. ALL TREES NOT SPECIFICALLY NOTED OR MARKED ON SITE FOR REMOVAL SHALL REMAIN
<br />PROTECTED AND UNDISTURBED DURING CONSTRUCTION. TREE PROTECTION SHALL EXTEND TO THE DRIP LINE,
<br />WITHIN WHICH NO CONSTRUCTION ACTIVITY, MATERIAL STORAGE, OR VEHICLE PARKING SHALL BE PERMITTED.
<br />TREE PROTECTION FENCING SHALL BE ERECTED PRIOR TO CONSTRUCTION START PER PLANS OR AS DIRECTED
<br />BY OWNER/LANDSCAPE ARCHITECT. SILT FENCE PER PLANS MAY COUNT AS TREE PROTECTION FENCING ON
<br />THIS PROJECT.
<br />1111 II II l l 1 >;H111'111I)1 IJ111J
<br />I lldiil fllllllllYIIIYII Illy °fliiYih� II II'lll'li I i
<br />IIIIIIII
<br />Illlp,,,
<br />4144
<br />/
<br />/
<br />/
<br />/
<br />_
<br />4411,
<br />CLEARING AND GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING ALL AREAS
<br />INDICATED AS BEING DISTURBED OR OTHERWISE SHOWN ON PLANS. CLEARING AND GRUBBING SHALL INCLUDE
<br />REMOVAL AND DISPOSAL OF ALL TREES, STUMPS, BRUSH, GRASS, ROOTS AND OTHER ORGANIC MATERIAL AT
<br />AN APPROVED OFF —SITE DISPOSAL LOCATION.
<br />SOIL PREPARATION. EXISTING TOPSOIL SHALL BE STRIPPED FROM ALL DISTURBED AREAS AND STOCKPILED IN
<br />AN APPROVED LOCATION FOR RE —SPREAD. ALL AREAS WHERE SOIL HAS BEEN COMPACTED BY
<br />CONSTRUCTION ACTIVITY AND THAT ARE INDICATED TO BE SODDED OR SEEDED SHALL BE DE —COMPACTED TO
<br />A MINIMUM DEPTH OF 12 INCHES BY SOIL RIPPING, TILLING OR OTHER APPROVED SOIL LOOSENING METHOD.
<br />6. TOPSOIL MATERIAL. TOPSOIL MEETING THE CITY'S SPECIFICATION SHALL BE REQUIRED PER EACH LOT.
<br />COPIES OF THE LOAD TICKET SHALL BE PROVIDED AND CITY INSPECTION IS REQUIRED PRIOR TO
<br />INSTALLATION OF SEED OR SOD. A MINIMUM 4 INCH DEPTH OF TOPSOIL SHALL BE PLACED ON ALL AREAS TO
<br />BE SODDED OR SEEDED.
<br />7. SEEDING AND TURF ESTABLISHMENT. CONTRACTOR SHALL APPLY 12-12-12 GRANULAR STARTER FERTILIZER
<br />AT A RATE OF 250 LBS PER ACRE PRIOR TO SEEDING. SEEDS SHALL BE SOWED AT THE INDICATED RATE,
<br />VIA BROADCAST SPREADER, DROP SEEDER OR DRILL SEEDER. FOLLOWING SEED APPLICATION, INSTALL TYPE
<br />3N EROSION CONTROL BLANKET ON ALL SLOPES GREATER THAN 4:1. IN ALL OTHER AREAS, APPLY
<br />HYDROMULCH COVER OR DISC ANCHORED STRAW PER MNDOT SPECIFICATIONS. SOIL SHALL BE KEPT MOIST
<br />DURING ESTABLISHMENT WITH ADDITIONAL RE —SEEDING AS NECESSARY TO ACHIEVE A HEALTHY, UNIFORM
<br />STAND OF GRASS, FREE OF WEEDS AND WITH COVERAGE EXCEEDING 75% IN ANY 10'x10' AREA PRIOR TO
<br />FINAL ACCEPTANCE.
<br />8. PLANT MATERIAL. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY
<br />STOCK," ANSI—Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL
<br />CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS. OWNER/LANDSCAPE ARCHITECT
<br />RESERVE THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY BEFORE, DURING, OR
<br />AFTER INSTALLATION. TREES SHALL NOT BE PLANTED WITHIN THE VISION TRIANGLE AS DEFINED IN CITY CODE
<br />117-348
<br />9. PLANT MATERIAL SUBSTITUTIONS. ALL REQUESTS FOR PLANT SUBSTITUTIONS SHALL BE MADE IN WRITING TO
<br />THE OWNER/LANDSCAPE ARCHITECT AND MUST BE APPROVED BY THE CITY PRIOR TO INSTALLATION.
<br />10. MULCH MATERIAL. DOUBLE SHREDDED HARDWOOD MULCH SHALL BE PLACED AROUND INDIVIDUAL TREES TO A
<br />4' MINIMUM DIAMETER. ALL MULCH SHALL BE CLEAN AND FREE OF NOXIOUS WEEDS, SOIL, OR OTHER
<br />DELETERIOUS MATERIAL, AND SHALL BE INSTALLED TO A MINIMUM SETTLED DEPTH OF 4". MULCH SHALL BE
<br />HELD BACK FROM PLANT STEMS/TRUNKS A MINIMUM OF 3".
<br />11. IRRIGATION (BY OTHERS). DESIGN, FURNISH AND INSTALL A COMPLETE UNDERGROUND IRRIGATION SYSTEM
<br />FROM APPROVED POINT(S)—OF—CONNECTION WITHIN THE SITE COVERING ALL TURF AND PLANTING AREAS AS
<br />SHOWN ON THE LANDSCAPE PLAN. IRRIGATION PLANS TO BE PREPARED BY A QUALIFIED IRRIGATION
<br />DESIGNER AND SUBMITTED TO OWNER/LANDSCAPE ARCHITECT FOR APPROVAL. IRRIGATION SYSTEM SHALL BE
<br />DESIGN BUILT BY THE CONTRACTOR AND SHALL UTILIZE MATCH PRECIPITATION HEADS, HEAD TO HEAD
<br />COVERAGE AND WEATHER COMPENSATING SMART CONTROLLER.
<br />12. MAINTENANCE. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE.
<br />PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS
<br />COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE.
<br />13. WATERING. UPON ESTABLISHMENT OF SEED AND INSTALLATION OF PLANTS, CONTRACTOR SHALL MAINTAIN A
<br />WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS AND TURF AREAS A MINIMUM OF ONCE A
<br />WEEK. MORE FREQUENT WATERING MAY BE REQUIRED DURING PERIODS OF HOT, DRY WEATHER. CONTRACTOR
<br />SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. IN THE ABSENCE OF PERMANENT IRRIGATION,
<br />TEMPORARY IRRIGATION, TREE WATERING BAGS, OR HAND —WATERING ARE ACCEPTABLE.
<br />14. NATIVE PLANT ESTABLISHMENT. THIS PROJECT INCLUDES ONE OR MORE NATIVE PLANT SEED MIXES
<br />CONSISTING OF A VARIETY OF GRASSES AND FLOWERING FORBS. BECAUSE THESE PLANTS TYPICALLY HAVE A
<br />LONGER GERMINATION PERIOD, A COVER CROP SPECIES MAY BE REQUIRED TO PROVIDE TEMPORARY COVER
<br />AND STABILIZATION. MAINTENANCE OF THESE SEEDED AREAS IS CRITICAL DURING THE FIRST SEVERAL YEARS
<br />TO ESTABLISH A SUCCESSFUL NATIVE PLANT COMMUNITY. SEEDED AREAS SHALL BE MOWED /
<br />WEED —WHIPPED TO A HEIGHT OF 6-10 INCHES IN MID—JULY AND EARLY SEPTEMBER DURING THE FIRST 2-3
<br />YEARS OF ESTABLISHMENT. IN ADDITION, ALL NON—NATIVE SPECIES / WEEDS SHALL BE SPOT SPRAYED NO
<br />LESS THAN 3 TIMES A YEAR WITH HERBICIDE BY A LICENSED APPLICATOR. RE —SEEDING AS NECESSARY
<br />SHALL OCCUR IN MAY. A NATIVE PLANT COMMUNITY SHALL BE CONSIDERED SUCCESSFULLY ESTABLISHED NO
<br />SOONER THAT 3 YEARS AFTER INITIAL SEEDING — ONCE THE COVER CROP HAS BEEN SUFFICIENTLY
<br />REPLACED BY NATIVE PLANTS AND THE AREA IS FREE OF ALL NON—NATIVE AND INVASIVE SPECIES. AT THIS
<br />TIME, MAINTENANCE CAN BE REDUCED TO MOWING / WEED —WHIPPING TO A HEIGHT OF 6-10 INCHES ONCE A
<br />YEAR IN EARLY SEPTEMBER AND SPOT SPRAYING OF HERBACIDE ONLY AS NEEDED.
<br />15. FINAL ACCEPTANCE. UPON SUBSTANTIAL COMPLETION OF THE WORK, CONTRACTOR SHALL REQUEST FINAL
<br />ACCEPTANCE OF THE WORK IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT. IF ANY WORK IS FOUND TO
<br />BE INCOMPLETE OR UNSATISFACTORY IN THE OPINION OF THE OWNER/LANDSCAPE ARCHITECT, A WRITTEN
<br />PUNCH LIST WILL BE PREPARED LISTING ALL ITEMS THAT REQUIRE COMPLETING OR CORRECTING BEFORE
<br />FINAL ACCEPTANCE.
<br />16. GUARANTY. CONTRACTOR SHALL GUARANTEE ALL NEW PLANT MATERIAL FOR TWO (2) FULL GROWING
<br />SEASONS AFTER THE DATE OF WRITTEN FINAL ACCEPTANCE BY THE LANDSCAPE ARCHITECT. ANY PLANT
<br />MATERIAL THAT DIES, TURNS BROWN OR DEFOLIATES DURING THE GUARANTEE PERIOD SHALL BE IMMEDIATELY
<br />REPLACED AT NO ADDITIONAL COST TO THE OWNER AND SHALL BE COVERED BY THE SAME GUARANTEE. THE
<br />GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND MATERIAL
<br />0 25 50 100
<br />(IN FEET)
<br />CALL BEFORE YOU DIG
<br />11111111
<br />Know what's below.
<br />Call before you dig.
<br />CARLSONIIIIII1:IIIIII1IIIIIIIIII111111I11"
<br />VIII1114'1111 IIII'
<br />u „IIIIIIIIII u1 u1 � , 1111 E 1111 1111^, i 111 u1 :. u1...
<br />3890 PHEASANT RIDGE DR NE
<br />SUITE 100
<br />BLAINE, MN 55449
<br />TEL 763.489.7900
<br />FAX 763.489.7959
<br />CARLSONMCCAIN.COM
<br />Save Date: 12/12/24 I f:\jobs\8301 - 8320\8301 - pearson property - ramsey\cad c3d\landscape\8301_landscape.dwg
<br />I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA
<br />or report was prepared by me or under my
<br />direct supervision and that I am a duly
<br />Licensed Landscape Architect under
<br />the laws of the State of Minnesota
<br />Signature:
<br />G26— 05174---
<br />Drawn: RJR
<br />Designed: RJR
<br />Date: 12/02/24 License #: 56346 Date: 12/02/24
<br />Revisions:
<br />1. 01/02/25 - per City Comments
<br />DEVELOPMENT CONSULTING SERVICES
<br />604 Bielenberg Drive
<br />Woodbury, MN 55125
<br />RIVERSTONE SOUTH
<br />SIXTH ADDITION
<br />Ramsey, MN
<br />PRELIMINARY
<br />LANDSCAPE PLAN
<br />Ll
<br />of
<br />/ 1
<br />
|