My WebLink
|
Help
|
About
|
Sign Out
Home
Trail Development Volume II
>
Park & Recreation Comm Miscellaneous
>
Trott Brook Corridor
>
Trail Development Volume II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2006 11:37:28 AM
Creation date
9/22/2006 11:36:21 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />29. Impact on Infraltructura and Public S.rvlca Will new or expanded utilities, roads, other infrastructUre, or public services be <br />required to serve the project? 0 Yes 0 No <br />If yes, describe the new or additional infrastructure /services needed. (Any infrastTul:ture that is il "connected a.c:tion" with respect <br />to the project must be assessed in this EA W; see "EA W Guideli~" for deti:zils.) <br /> <br />I <br /> <br />I <br /> <br />30. Ralatecl Dev.lopments; Cumulative Impacts <br />a. Are future stages of this development planned or likely? 0 Yes 0 No <br />If yes, briefly describe future stages, their timing, and plans for environmental review. <br />b. Is this project a subsequent stage of an earlier project? 0 Yes 0 No <br />If yes, briefly describe the past development, its timing, and any past envU'onmental review. <br />C. Is other development anticipated on adjacent lands or outlots? 0 Yes 0 No <br />If yes, briefly describe the development and its relationship to the present project. <br />d. If a,b;or c were marked Yes, discuss any cumulative environmental impacts resulting from this project and the other <br />development. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />31. Othar Potlntlal Envlronmantallmpacta If the project may cause any adverse environmental impacts which were not addressed by I <br />items 1 to 28, identify and discuss them here, along with any proposed mitigation. <br /> <br />I <br /> <br />32. SUMMARY OF ISSUES (This section ne:ed not be completed if the EA W is being do~ for EIS scoping; instad, address releoant issues in the <br />draft Scoping Decision document which must 4CCOmpany the EA W.) List any impacts and issues identified above that may require I <br />further investigation before the project is commenced. Discuss any alternatives or mitigative measures that have been or may <br />be considered for these impacts and issues, including those that have been or may be ordered as permit conditions. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />CERTIFICATIONS BY THE RGU (all 3 certifications must be signed for fOB acceptance of the EAW for publication of I <br />notice in the fOB Monitor) <br /> <br />A. I hereby certify that the information contained in this document is accurate and complete to the best of my knowledge. I <br />Signature <br /> <br />B. I hereby certify that the project described in this EA W is the complete project and there are no other projects, project stages, or <br />project components, other than those described in this document, which are related to the project as "connected actions" orl <br />"phased actions," as defined, respectively, at Minn. Rules, pts. 4410.0200, subp. 9b and subp. 60. <br />Signature <br /> <br />C. I hereby certify that copies of the completed EA Ware being sent to all points on the official EQB EA W distribution list. I <br />Signature <br /> <br />Title oi signer Date <br /> <br />6 <br /> <br />MinnCICU Envuanmental QualllY Boanl. ReV\SCd June 19'10 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.