Laserfiche WebLink
City of Ramsey <br />15153. Nowthen Blvd NW <br />Ramsey, MN <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: <br />TO CONTRACTOR: <br />BKV Group, Inc. <br />Minneapo s, <br />ARCHlTe:1 <br />f <br />Byf <br />D <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br />Municipal Center \Construction\Contracts\1061 - George Cook <br />George F. Cook Construction Co <br />2300 Nevada Ave N, Suite 200 <br />Golden Valley, MN 55427 <br />The Contract is changed as follows: <br />FCA 60 - Provide additional plywood mounting coard in data room <br />F177, 8 foot high <br />FCA 66 - Provide plywood backing as shown on the plans in the <br />following locations: Sheet E3.1 B, Room F112 AV and Sheet E3.1 C, <br />Room F256 Data /Comm <br />PR 39 - Add steel framing and metal deck at training room roof corner. <br />PR 56 - Increase height of coiling counter doors F151 B, F151 C, F151 D, <br />and F151 E. Also provide separate switching for each of these doors. <br />TOTAL CHANGES: <br />George F. Cook Construction Co <br />Golden Valley, MN <br />CHANGE ORDER NUMBER: <br />DATE: <br />CONTRACTOR DATE: <br />CONTRACTOR FOR: <br />to Date <br />CONTRACTOR <br />Add <br />Add <br />Add <br />Add <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />Add <br />ORIGINAL <br />1061 -10 <br />24- Jul -2006 <br />25- May - 2005 <br />RM =1061: General Trades <br />City of Ramsey <br />Ramsey, MN <br />OtP <br />VV <br />ei <br />$1,464.00 <br />$1,039.00 <br />$218.00 <br />$790.00 <br />$3,511.00 <br />$698,000.00 <br />$25,518.00 <br />$723,518.00 <br />$3,511.00 <br />$727,029.0,0 <br />31- Aug -2006 <br />-161- <br />