Laserfiche WebLink
5.5. <br />Public Works Committee <br />Meeting Date: 11/21/2023 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommendation for City Council to Accept Bids and Award Contract for Water Treatment Plant <br />Trunk Watermain Improvements, Improvement Project #21-08 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider a recommendation for the City Council to accept bids and award a <br />construction contract for Water Treatment Plant Trunk Watermain Improvements, Improvement Project #21- <br />08. <br />Background: <br />On March 9, 2021, the Ramsey City Council adopted Resolution #21-061 awarding a contract to SEH Inc. to <br />prepare plans and specifications for Improvement Project #21-08, Water Treatment Plant Trunk Watermain <br />Improvements. <br />On October 26, 2021, the Ramsey City Council adopted Resolution #21-303 approving final plans and <br />specifications and authorizing advertisements for bids using a base bid and an alternate bid as follows; <br />• Base bid — The base bid specified a combination of construction techniques whereby open trenching of <br />watermain is specified alongthe south side of Bunker Lake Boulevard and the north side of 143 rd <br />p <br />Avenue, while directional drilling of watermain is specified at intersections, through Cottonwood Park, <br />under Sunwood Drive, and under the stormwater pond between Hoya and Anderson Dahlen north of <br />143rd Avenue. <br />• Alternate bid — The alternate bid specified directional drilling of watermain across as much of the project <br />area as feasible. <br />On January 25, 2022, the Ramsey City Council adopted Resolution #22-003 rejecting all bids and authorizing <br />Staff to work with SEH, Inc. to revise the approved plans to reduce project costs and to monitor the bidding <br />environment to identify the most favorable time to bid the project again. <br />On July 25, 2023, the Ramsey City Council adopted Resolution #23-168 executing a new Professional Services <br />Agreement with SEH, Inc. to revise the previously approved plans and to re -bid said improvements for 2024 <br />construction in advance of the Water Treatment Plant commissioning in the Spring of 2025. <br />The plan revisions from the 2021 bid set are the result of staff additions to the water system and contractor <br />feedback from previous bids. The changes consist of the following elements: <br />1. Adding an underground meter vault near well #8 on the existing water main in the park, including <br />associated instrumentation for operation ease. <br />2. Adding a new water main between Bunker Lake Boulevard and 147th Terrace to complete the loop. The <br />water main is anticipated to be installed on City owned property where Well No. 3 is located. Also, a new <br />