My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 11/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:44:46 AM
Creation date
1/17/2025 7:48:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-inch service line is proposed to be installed off this line to the existing well house for priming the Well <br />No. 3 pumps. <br />3. Re -design the water main in Town Center Drive south of Bunker Lake Boulevard and remove the water <br />main in the open space easement to open this parcel up for future development. <br />4. Install a new 1-inch service line off Town Center Drive to the wellhouse building at Well No. 5 for pump <br />priming purposes. <br />5. Modify the plans for the 24-inch raw water main on the trail north of Sunwood Drive to use open cut <br />installation rather than Horizontal Directional Drilling (HDD), with the exception of under Sunwood <br />Drive, which will still be HDD to avoid impacting the recently reconstructed street. <br />6. Include trenchless installation of the water main crossing Bunker Lake Boulevard at 143rd Avenue to <br />avoid impacts to the recent improvements to Bunker Lake Boulevard. <br />7. The trunk water main under 143rd Avenue will now be fully installed via open cut trench installation <br />followed up with full depth bituminous pavement replacement due to the age and condition of the <br />existing pavement, and to avoid reconstructing one side of the street and overlaying the other, putting the <br />two sides of the street on different maintenance schedules. Due to construction traffic using this route for <br />the WTP construction and maintaining access to adjacent commercial properties, phased pavement <br />removal is anticipated to maintain a hard driving surface to the greatest extent possible. <br />On September 26, 2023, the Ramsey City Council adopted Resolution #23-236 approving final plans and <br />specifications as prepared by SEH, Inc. and authorized the advertisement of bids. <br />Bids were advertised in Finance and Commerce and the Anoka Union Herald on Friday, September 29, and <br />Friday, October 6, 2023, and were also advertised and managed online on QuestCDN. <br />On November 1, 2023, seven (7) bids were received. All bids were competitive, and the low bid received, both <br />for the base bid and the alternate bid, was submitted by Northdale Construction Company Inc. of Albertville, <br />Minnesota. <br />CONTRACTOR <br />TOTAL BASE BID <br />TOTAL ALTERNATE <br />BID <br />Northdale Construction Co. Inc. <br />$6,671,413.99 <br />$6,671,414.00 <br />Park Construction Company <br />$7,106,594.45 <br />$7,106,594.46 <br />Geislinger & Sons <br />$7,230,597.00 <br />$7,264,597.00 <br />S.M. Hentges & Sons, Inc. <br />$7,357,844.80 <br />$7,357,845.80 <br />RL Larson Excavating, Inc. <br />$7,613,079.74 <br />$7,613,079.75 <br />Meyer Contracting Inc. <br />$7,929,324.30 <br />$7,929,324.31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.