My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 01/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:54:23 AM
Creation date
1/31/2025 2:59:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 11. <br />CC Regular Session <br />Meeting Date: <br />01/28/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolution #25-031 Approving Construction Contingency Expense No. 8 for Improvement Project #21-09, <br />Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-031 approving Construction Contingency Expense No. 8 for <br />Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />The Water Treatment Plant (WTP) project includes a construction contingency cost of $950,000 intended to pay <br />for new items during construction that were not contemplated during the design process or for items that the <br />owner, engineer, or contractor(s) propose to revise during construction. <br />The attached letter from Resident Project Representative Ryan Hanson with Advanced Engineering and <br />Environmental Services, Inc. (AE2S), the City's contracted project engineer, identifies those items approved <br />under previous Construction Contingency Expense requests, as well as the items proposed to be adjusted during <br />construction as part of Construction Contingency Expense No. 8. <br />No extension of time is being requested as part of Construction Contingency Expense No. 8. However, the <br />contractor may decide at a later date to request an extension of time for any of the Construction Contingency <br />Expenses. If a time extension request is made, it will be presented at a later date in the form of a formal Change <br />Order request. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The modifications proposed with Construction Contingency Expense No. 8 will reduce maintenance costs and <br />improve environmental conditions within the WTP over the life of the plant, and are necessary to accommodate <br />previous plan modifications resulting from Department of Labor and Industry requirements and modifications <br />approved as part of Construction Contingency Expenses #1 and #3. <br />Alternatives: <br />Motion to adopt Resolution #25-031 approving Construction Contingency Expense No. 8 for Improvement <br />Project #21-09, Centralized Water Treatment Plant. <br />Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.