Laserfiche WebLink
6. 11. <br />CC Regular Session <br />Meeting Date: <br />01/28/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolution #25-031 Approving Construction Contingency Expense No. 8 for Improvement Project #21-09, <br />Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-031 approving Construction Contingency Expense No. 8 for <br />Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />The Water Treatment Plant (WTP) project includes a construction contingency cost of $950,000 intended to pay <br />for new items during construction that were not contemplated during the design process or for items that the <br />owner, engineer, or contractor(s) propose to revise during construction. <br />The attached letter from Resident Project Representative Ryan Hanson with Advanced Engineering and <br />Environmental Services, Inc. (AE2S), the City's contracted project engineer, identifies those items approved <br />under previous Construction Contingency Expense requests, as well as the items proposed to be adjusted during <br />construction as part of Construction Contingency Expense No. 8. <br />No extension of time is being requested as part of Construction Contingency Expense No. 8. However, the <br />contractor may decide at a later date to request an extension of time for any of the Construction Contingency <br />Expenses. If a time extension request is made, it will be presented at a later date in the form of a formal Change <br />Order request. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The modifications proposed with Construction Contingency Expense No. 8 will reduce maintenance costs and <br />improve environmental conditions within the WTP over the life of the plant, and are necessary to accommodate <br />previous plan modifications resulting from Department of Labor and Industry requirements and modifications <br />approved as part of Construction Contingency Expenses #1 and #3. <br />Alternatives: <br />Motion to adopt Resolution #25-031 approving Construction Contingency Expense No. 8 for Improvement <br />Project #21-09, Centralized Water Treatment Plant. <br />Funding Source: <br />