Laserfiche WebLink
AGNEY[ONSTRUCTION <br />rnMMFnrIAI Fr INflhI5TRIAL [ONTRATflR5 <br />*Lire� 1401 Park Road - Chanhassen, MN 55317 <br />�w.ma9neyconstr,ceon.com 952474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name From <br />Noah Pundsack <br />AE2S <br />Proposal <br />Attention Date <br />Mr. Ryan Hanson 10/16/2024 <br />E-mail Phone Magney Proposal No. 028 <br />Ryan.Hanson@ae2s.com (612) 220-0154 Field Order No. 016 Chemical Containment Modifications <br />Urgent Please comment X� Please review fl For your information <br />Total pages, including cover: 2 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Ryan <br />Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br />material, and equipment to complete the requested changes In Field Order No. 016 - To match the added <br />detail for the chemical containment walls adding waterstop, modifying the rebar to match the new detail. See <br />the costs associated with change are summarized below. <br />Labor: Install An Additional 125' Of Waterstop $ 934.38 <br />Material: Additional 125' Of Waterstop (Including Tax) $ 562.25 <br />Material: Rebarfab -Provide Additional 125 Lbs. Of Rebar (Including Tax) $ 427.09 <br />Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 93.44 <br />Subcontractor: <br />Subtotal $ 2,017.16 <br />General Contractor's Overhead $ 302.57 <br />Bond & Insurance premiums $ 34.80 <br />Lump Sum Total: $ 2,354.53 <br />Additional Calendar Days Required for this Change (Including material lead time): <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noun P1dd9ac4 <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />Page 1 of 1 <br />