Laserfiche WebLink
619arfaki <br />ITIC. <br />REINFORCING BAR FABRICATORS <br />Phone: (651) 633-3337 Shipping: 720 First St. S. W. <br />Fax: (651) 633-2332 Mailing: P.O. Box 120267 <br />E-mail: nickw(airebarfabinc.com New Brighton, MN 55112 <br />1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 <br />Date: September 16, 2024 <br />To: Magney Construction <br />Attn: Noah Pundsack <br />Project: Ramsey WTP <br />Rebarfab, Inc. Job #23067 <br />Change Order: #6 <br />Control Code -Release #N/A <br />111111111s m11111111111111111111111111111 <br />DESCRIPTION OF CHANGES IN THIS CONTRACT: <br />Revisions to SOG trenches per FO #16 <br />Weight Added: 125 lbs $95.00 Black 0 Epoxy ❑ <br />Time Added: 3 hours $300.00 <br />Misc. Added: None <br />Freight Added: None <br />Total Cost This Change: $395.00 ** Tax excluded. Add applicable taxes. <br />ALL PRICES ARE PLUS TAX UNLESS NOTED OTHERWISE. <br />UPON SIGNATURE, CONTRACTOR IS TAKING FULL RESPONSIBILITY. <br />ALL OTHER TERMS AND CONDITIONS OF THE CONTRACT REMAIN THE SAME. <br />SIGNED COPY RETURNED VIA FAX REQUIRED PRIOR TO FABRICATION. <br />Rebarfab, Inc. <br />f <br />.111 <br />r /9 <br />• <br />Approved by: Approved by: : ' '- <br />Nick Watercott <br />