Laserfiche WebLink
Guide Specification for CU-3 <br />Project: Ramsey WTP <br />Prepared By: Tim May <br />10/10/2024 <br />09:24AM <br />1. Switch shall be factory -installed and internally mounted. NEC and UL-approved non -fused switch shall provide unit <br />powershutoff. Switch shall be accessible from outside the unit and shall provide powerofflockoutcapability.Non- <br />fused disconnectswitch cannot be used when unit MOCP electrical rating exceeds 80 amps. <br />B. Convenience Outlet: <br />1. Non -Powered convenience outlet. <br />a Outletshall be powered from a separate 115/120v powersource. <br />b. Atransformershall not be included. <br />c. Outletshall be factory -installed and internally mounted with easily accessible 115-vfemale receptacle. <br />d. Outletshall include 15 amp GFI receptacleswith independentfuse protection. <br />e. Outlet shall be accessible from outside the unit. <br />f. Outlet shall include a field -installed "Wet in Use" cover. <br />C. Thermostat Controls: <br />1. Programmable multi -stage thermostat shall have 7-dayclock, holidayscheduling, large backlitdisplay, remote sensor <br />capability, and Title 24 compliance. <br />2. Commercial ElectronicThermostatshall have 7-daytime clock, auto -changeover, multi -stage capability, and large <br />LCD (liquid crystal display) temperature display. <br />Commercial Split Systems Builder 1.67 Page 13 of 15 <br />