Yolite Street and/or future Ramsey Parkway. A cross -access and maintenance agreement is required, will be <br />prepared by the City Attorney, and recorded with the plat. <br />For a building this size, 17 parking spaces are required at the rate of one space per 300 square feet of building <br />area. Twenty spaces are provided in the lot which is adequate for the bank's needs based on the bank's other <br />locations. It is anticipated that staff and some customers will use the parking lot while many customers will find <br />the on -street parking available on Sunwood Drive very convenient. About six parallel parking spaces are adjacent <br />to the site. The Fire Department has requested a "no parking here to corner" sign be placed near the intersection to <br />provide adequate sight lines and turning radius for the fire trucks. <br />The drive-thru lanes on the immediate north side of the building will have an exit -only driveway to Zeolite <br />Street. <br />Zeolite Street <br />Zeolite Street is currently constructed as a temporary roadway. It will be reconstructed in 2024 to urban standards <br />with sidewalks, curbing, and boulevard trees. The design of the roadway is not completed, though it is anticipated <br />that the roadway will be raised slightly to accommodate storm water drainage. The placement of the driveways <br />will accommodate changes in elevation easily. In the meantime, the Engineering Department noted that <br />temporary culverts may be necessary under both driveways. <br />Pedestrian Connections <br />The building is being constructed with a front door in a corner vestibule onto Sunwood Drive. The vestibule will <br />also have a door facing east to the parking lot. A direct sidewalk connection is provided to the sidewalk along <br />Sunwood Drive. The applicant will construct its portion of the Sunwood Drive sidewalk and streetscape with <br />construction of the building. Due to the building having its elevation 1.5 feet above the street elevation, a couple <br />steps are needed. An ADA-compliant ramp will be located just to the east, closer to the parking lot. The <br />landscaped planting beds along Sunwood Drive are being designed to line up with the building's walkways. <br />Landscaping and Screening <br />The applicant provided a landscape plan that generally meets the landscape requirements. The Environmental <br />Policy Board (EPB) reviewed the plans at its meeting on May 15. The plans do include a tree inventory. There <br />are 27 trees on the roughly 1.25 acres that the bank would be constructed. There are two red cedars, one box <br />elder, and the rest are Siberian elms, which are an invasive species. All trees within this 1.24-acre site are <br />proposed to be removed. As the vast majority of them are invasive, they would be excluded from the removal <br />threshold. Thus, based on the proposed landscaping, the project will satisfy the tree preservation standards via <br />reforestation on site. Staff has requested a bit more information regarding the tree inventory and preservation <br />plan, but nothing of any great significance. <br />The Landscape Plan is generally acceptable with the corrections noted on the plan sheets. Staff is working with <br />the Applicant to lengthen the eastern most planter bed along Sunwood Drive so it matches the beds east of Zeolite <br />Street (south side of Sunwood Drive). Additionally, Zeolite Street will be reconstructed (a City project) in 2024, <br />so it does not make sense to have boulevard trees installed until after the road project is complete. Based on the <br />linear footage along Zeolite Street (about 270 feet), eight boulevard trees would be required (spaced at 35 feet on <br />center). Similar to the hotel project, which is just across Zeolite Street from the Subject Property, Staff is <br />recommending collecting a boulevard tree fee through the Development Agreement that can be used to purchase <br />and install these trees in accordance with the COR Design Framework as part of the City's road construction <br />project. There are other minor corrections needed on the Landscape Plan as noted on the attached plan sheets. <br />Lighting <br />The applicant provided a lighting plan with photometrics showing adequate amounts of light over the parking lot <br />and pedestrian areas. The plan shows 25-foot poles. It is recommended that the poles be reduced to 15- to 20-feet <br />in height to be in line with the proposed lighting standards of the Zoning Code update and to be more proportional <br />with the 28-foot building height. The lights under the drive-thru canopy appear to have a dropped lens. Current <br />Code prohibits off -site views of light sources therefore a side shield may be necessary. <br />