My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/08/2001
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 05/08/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:21:46 PM
Creation date
10/10/2006 10:42:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/08/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thirty (30) days of completion by the testing laboratory. At a minimum, the parameters of <br />such emissions monitoring shall include the following State and Federal criteria pollutant <br />emissions as may exist from time to time during the term of this permit. The cost of such <br />testing and reports shall be borne by the Permit Holder. <br />OUTLINE OF REVISED MONITORING PROGRAM <br />Sample Type Parameter Frequency* <br />Stack Emissions Particulates, opacity Annually <br />(3 samples minimum per event) <br />*Assumes no significant change in wastes to be incinerated. <br />The City and the Permit Holder may mutually agree to revise the monitoring program from time to <br />time. Such revisions shall be authorized in accordance with Condition 36 herein. <br />7.. Installation of Afterburners. The Permit Holder shall install and operate afterburners <br />for each melt furnace to minimize stack emissions. An afterburner unit shall be installed on <br />each melt furnace no later than March 15, 1991. <br />8. Emergency Emissions Testing. If, in the opinion of the City Administrator or his <br />authorized representative, it is determined to conduct pollution tests during an officially <br />reported incident, the City may contract with an independent testing laboratory who shall be <br />permitted access to the facility to conduct tests as may be prescribed by the City and to <br />evaluate conditions of the facility. The cost of such evaluation testing and reports shall be <br />borne by the Permit Holder and payment for such costs will be due within 30 days of the <br />invoice date. <br />9. Corrective Actions. The City may order the Permit Holder to undertake corrective <br />actions within specific time frames based on test results or evaluations to remedy pollution <br />problems or nuisance complaints. If the Permit Holder fails to take corrective action within <br />specified time frames, it may be determined by the City Council to be a violation of the <br />CUP and cause for permit revocation. <br />' 10. Disassembly of Engines, Transmissions, Other Feedstock. Disassembly of <br />engines, transmissions shall not be permitted on the Site under this Conditional Use Permit <br />unless conducted wholly within a building and in accordance with County, State and <br />Federal requirements. Preparation of all other feedstock is permitted only within an <br />opaquely screened area or within the. building. <br />11. Storage of Feedstock, Separated Materials. Storage of materials which are used in <br />or result from the processing operation is permitted on Site providing that stockpiles are <br />properly contained and screened from adjoining properties and City streets. <br />12. Oil Residues on Paved Surfaces. The Permit Holder shall store all feedstock <br />, material with oil residues within leakproof containers so as to minimize potential storm <br />water runoff contamination. <br />13. Outside Storage of Materials and Equipment. The outside storage of debris or <br />materials not used in the operation and inoperable vehicles and equipment shall not be <br />permitted. <br />2 <br />-85- <br />
The URL can be used to link to this page
Your browser does not support the video tag.