My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/24/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 10/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:52:30 PM
Creation date
10/20/2006 3:17:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SCHEDULE <br />Item <br />"A" - CONTINUED <br />Description <br />Estimated Quantity <br />Unit Price <br />Contract Price <br />Used to <br />Date <br />Extension <br />' <br />DEPTH MANHOLE (OVER 8 ") 48 <br />31 <br />LF <br />$ 100.00 <br />$ 3,100.00 <br />25 <br />$ 2,500.00 <br />46 <br />EXTRA <br />4" CONCRETE WALK <br />2500 <br />SF <br />$ 3.00 <br />$ 7,500.00 <br />2,416 <br />$ 7,248.00 <br />47 <br />VALLEY GUTTER <br />780 <br />LF <br />$ 14.00 <br />$ 10,920.00 <br />490 <br />$ 6,860.00 <br />48 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />5700 <br />LF <br />$ 8.00 <br />$ 45,600.00 <br />5883 <br />$ 47,064.00 <br />49 <br />CURB AND GUTTER DESIGN B624 <br />132 <br />LF <br />$ 17.00 <br />$ 2,244.00 <br />$ - <br />50 <br />CONCRETE <br />7" CONCRETE DRIVEWAY PAVEMENT <br />2450 <br />SF <br />$ 3.90 <br />$ 9,555.00 <br />2889.5 <br />$ 11,269.05 <br />51 <br />CURB RAMP <br />2 <br />EACH <br />$ 360.00 <br />$ 720.00 <br />2 <br />$ 720.00 <br />52 <br />PEDESTRIAN <br />F & I 2" RIGID STEEL CONDUIT <br />89 <br />LF <br />$ 4.00 <br />$ 356.00 <br />178 <br />$ 712.00 <br />53 <br />F & I 4" RIGID STEEL CONDUIT <br />178 <br />LF <br />$ 5.00 <br />$ 890.00 <br />178 <br />$ 890.00 <br />54 <br />PANELS TYPE C <br />30.75 <br />SF <br />$ 28.00 <br />$ 861.00 <br />$ - <br />55 <br />SIGN <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 750.00 <br />$ 750.00 <br />1 <br />$ 750.00 <br />56 <br />TYPE III BARRICADE <br />4 <br />EACH <br />$ 245.00 <br />$ 980.00 <br />$ - <br />57 <br />PAVEMENT MESSAGE (LEFT ARROW) EPDXY <br />4 <br />EACH <br />$ 100.00 <br />$ 400.00 <br />5 <br />$ 500.00 <br />58 <br />F & I SIGN PANEL TYPE "D" <br />3 <br />EACH <br />$ 275.00 <br />$ 825.00 <br />$ - <br />59 <br />4" BROKEN LINE YELLOW EPDXY <br />2645 <br />LF <br />$ 0.01 <br />$ 26.45 <br />520 <br />$ 5.20 <br />60 <br />SOLID LINE WHITE - EPDXY <br />3045 <br />LF <br />$ 0.50 <br />$ 1,522.50 <br />5539 <br />$ 2,769.50 <br />61 <br />4" <br />STOP LINE WHITE - EPDXY <br />53 <br />LF <br />$ 5.15 <br />$ 272.95 <br />$ - <br />82 <br />24" <br />4" DOUBLE LINE BROKEN & SOLID YELLOW - EPDXY <br />515 <br />LF <br />$ 0.50 <br />$ 257.50 <br />- 537 <br />$ 268.50 <br />63 <br />SOLID LINE WHITE - EPDXY <br />44 <br />LF <br />$ 5.15 <br />$ 226.60 <br />54 <br />$ 278.10 <br />64 <br />24" <br />LINE WHITE - PAINT <br />2675 <br />LF <br />$ 0.38 <br />$ 1,016.50 <br />$ - <br />65 <br />4" SOLID <br />DOUBLE LINE BROKEN & SOLID YELLOW - PAINT <br />515 <br />LF <br />$ 0.38 <br />$ 195.70 <br />$ - <br />66 <br />4" <br />4" - 6" PVC (SCH40) CONDUIT <br />600 <br />LF <br />$ 3.00 <br />$ 1,800.00 <br />600 <br />$ 1,800.00 <br />67 <br />INSTALL <br />CHECK <br />50 <br />EACH <br />$ 10.00 <br />$ 500.00 <br />$ - <br />68 <br />BALE <br />FENCE TYPE MACHINE SLICED <br />6000 <br />LF <br />$ 1.65 <br />$ 9,900.00 <br />844 <br />$ 1,392.60 <br />69 <br />SILT <br />CONSTRUCTION ROCK ENTRANCE <br />2 <br />EACH <br />$ 750.00 <br />$ 1,500.00 <br />2 <br />$ 1,500.00 <br />70 <br />TEMPORARY <br />2.0 <br />ACRE <br />$ 500.00 <br />$ 1,000.00 <br />0.8 <br />$ 400.00 <br />71 <br />SEEDING <br />MIXTURE 260 <br />200 <br />LB <br />$ 2.20 <br />$ 440.00 <br />80 <br />$ 176.0 <br />72 <br />SEED <br />MATERIAL TYPE 3 <br />4 <br />TON <br />$ 145.00 <br />$ 580.00 <br />1.6 <br />$ 232.0 <br />73 <br />MULCH <br />CONTROL BLANKETS CATEGORY 3 <br />4000 <br />SY <br />$ 1.70 <br />$ 6,800.00 <br />$ <br />74 <br />EROSION <br />FERTILIZER ANALYSIS 24 -2 -24 <br />700 <br />LBS <br />$ 0.40 <br />$ 280.00 <br />280 <br />$ 112.00 <br />75 <br />COMMERCIAL <br />CONCRETE PAVEMENT FOR BUS TRAFFIC' <br />124.4 <br />SY <br />$ 93.50 <br />$ 11,631.40 <br />120 <br />$ 11,220.00 <br />76 <br />r <br />SOLID LINE WHITE EPDXY" <br />72 <br />LF <br />$ 8.80 <br />$ 633.60 <br />72 <br />$ 633.60 <br />77 <br />36" <br />AND REPLACE CONCRETE" <br />374 <br />SF <br />$ 26.00 <br />$ 9,724.00 <br />374 <br />$ 9,724.00 <br />78 <br />REMOVE e Cnw Al o an 5 533.355.95 <br />PAY ESTIMATE #8 <br />Ramsey Town Center Phase 2, Segment 1 Improvements <br />Zeolite Street NW, Civic Center Drive NW and Sapphire Street NW <br />Improvement Project No. 05 -22 <br />Total Bid Schedule "A" - Street Construction <br />Per Change Order No. 1 <br />" Field Change <br />-1 <br />ra3176PEPay Estimate is <br />PE-2 of 3 <br />Contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.