My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/25/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 03/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:25:13 PM
Creation date
3/26/2025 2:20:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/25/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• July 23, 2024, the Ramsey City Council adopted Resolution #24-196, accepting the proposal from Bolton <br />& Menk, Inc. to prepare plans and specifications for Dickenson's Mississippi Estates Street <br />Reconstructions, Improvement Project #25-04. <br />• October 22, 2024, the Ramsey City Council adopted Resolution #24-302, accepting the amended proposal <br />from Bolton & Menk, Inc. to prepare plans and specifications for said improvements. <br />• November 12, 2024, the Ramsey City Council adopted Resolution #24-311, accepting the proposal from <br />Hydro-Klean, LLC for cleaning and televising the sanitary and storm sewer within the project area. <br />• March 13, 2025 Ramsey staff held a public open house for said improvements. <br />• March 18, 2025, the Ramsey Public works Committee reviewed the project, recommending City Council <br />approve the plans and specifications and authorize advertisement for bids for said improvements, including <br />the alternative bid. <br />Pavement History <br />The streets within Dickenson's Mississippi Estates were constructed in 1990. Crack seal / seal coat treatments <br />were received in 1996, 2003, and 2013. Ground Penetrating Radar (GPR) was performed on the streets in 2020. <br />At the time, the streets averaged 2.7 to 3.4 inches of bituminous over 3.7 inches of aggregate base. <br />Staff review of the geotechnical report found clean sands, ideal for pavement and utility support within the project <br />area. Additionally, groundwater is not anticipated to be a concern for the street reconstruction. <br />Proposed Improvements <br />Due to the condition of the existing watermain, the project includes replacing the existing watermain, and water <br />service lines up to and including the curb stops and fire hydrants. During construction temporary water will be <br />looped through the project and connected to the houses. <br />The original project anticipated only spot curb and gutter replacements. However, by replacing the watermain, the <br />majority of the existing concrete curb and gutter is impacted so the project calls for replacing all curb and gutters. <br />Also, valley gutters will be placed along Tungsten Street to separate Tungsten Street from the private parking lots <br />/ drives on both sides of Tungsten Street. <br />Because Tungsten Street handles frequent commercial vehicle traffic, it will be built to a 10-ton design including <br />4-inches of bituminous over 6-inches aggregate base. Rivlyn Avenue will be built to a standard neighborhood <br />section of 3.5-inches bituminous over 6-inches aggregate base. The cul-de-sac at the west end of Rivlyn Avenue <br />is partially within City -owned right of way and a roadway easement. Due mainly to the location of the existing <br />houses and driveways, it was not deemed feasible to expand the cul-de-sac, and it will be constructed back to its <br />current dimensions. <br />The storm sewer at the intersection of Rivlyn Avenue and Tungsten Street will be required to be replaced due to <br />the watermain replacement. Additionally, a hydrodynamic separator structure is being placed in the storm sewer <br />outfall line to the Mississippi River. This structure will be placed in the boulevard, just south of Rivlyn Avenue, <br />and is a cost-effective storm water quality retrofit solution that will serve to remove pollutants from the <br />stormwater runoff before it is discharged into the river. <br />City staff has discussed, and is continuing discussions with Lano, to address stormwater runoff concerns from <br />their property at 6140 Highway 10. Bolton & Menk performed stormwater analysis of the site and determined a <br />combination of on -site rate control and connection to the City storm sewer system is required to fully address the <br />concerns. After discussions with Lano, they prefer an underground stormwater storage system versus an above <br />ground pond, as vehicle storage space is already limited on their site. This project includes placing a storm sewer <br />manhole in the Tungsten Street right of way and a 12-inch storm sewer stubbed to the right of way for a future <br />connection to Lano's site. To fully make the connection, the storm sewer stub would cross the south end of <br />Global Gloves' property at 13601 Tungsten Street. Global Glove has indicated they are open to allowing the pipe <br />and subsequent permanent drainage and utility easement which would be necessary to make the connection. In <br />the meantime, Lano will continue working with their engineer to design on -site stormwater improvements for <br />potential future construction and connection to the 12-inch stub provided as part of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.