Laserfiche WebLink
Alternate Bid <br />Watermain and sanitary sewer extend from the west end of Rivlyn Avenue to Riverdale Drive, generally under <br />green space and a shared drive. As an alternate bid, the watermain is proposed to be replaced in the same manner <br />as the watermain under Rivlyn Avenue and Tungsten Street. The private shared driveway is proposed to be <br />replaced to match existing materials, a combination of gravel and bituminous. <br />The utilities are under an existing drainage & utility easement between Rivlyn Avenue and Riverdale Drive, <br />however, during design Bolton & Menk indicated additional temporary construction easement will be necessary to <br />actually perform the construction. In total, 5,364 square feet of easement spread across four properties would be <br />required as shown in the attached temporary easement exhibit. Staff mailed letters to the impacted properties on <br />February 12, 2025. To date, staff have been contacted by 3 of the 4 property owners, only one of whom is <br />agreeable to the temporary easements without further discussions necessary. <br />Because the alternate bid is not under Rivlyn Avenue itself, the work could be completed under a future project <br />without delaying the delivery of this project. If this is the case staff recommend adding a future watermain <br />replacement project to the Capital Improvement Plan. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications / authorizes ad for bids <br />o March 25, 2025 <br />• BMI Receives Bids <br />o May 1 — May 5, 2025 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o May 13, 2025 <br />• Contractor Begins Construction <br />o June 2025 <br />• Contractor Substantially Completes Construction <br />o New watermain in-service, new bituminous in -place, topsoil and seed in -place <br />o September 30, 2025 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o October 31, 2025 <br />Notification: <br />Notification is not required for this case. Staff will update the project webpage, to keep residents informed on the <br />progress of the project. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Per Public Works Committee direction, staff will continue to work with property owners to obtain the necessary <br />easements to construct the alternate bid. If the easements are not acquired before council considers awarding the <br />construction contract, city council can award the contract without the alternate bid. <br />Alternatives: <br />Motion to adopt Resolution #25-061 approving plans and specifications and authorizing advertisement for bids for <br />Dickenson's Mississippi Estate Street Reconstructions, Improvement Project #25-04. <br />Funding Source: <br />