My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/25/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 03/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:25:13 PM
Creation date
3/26/2025 2:20:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/25/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Funding for this improvement is proposed to come from Pavement Management Funds, Storm Water Utility <br />Funds, and Water Utility Funds. The following estimated costs are based off of Bolton & Menk's 95% <br />Construction Plans. The final project costs may change from the estimate depending upon bid prices and actual <br />construction quantities. <br />Ammon - <br />Founding Source i Estimated Project Costs CIP Project Costs <br />Pavement Management Funds $5451048* $306,722 <br />Storm Water Utility Funds $1311950* * $378,144 <br />Water Utility Funds $3581611 $2501000 <br />Project Total $1103 51608 $9341866 <br />It Bid (Water Utility Funds) $148, 530 - <br />Project Total w/Alt Bid 1$11184.,138 - <br />* Approximately $50,000 of additional concrete curb and gutter replacement is necessary due to replacing the <br />watermain. <br />* * The CIP included additional stormwater funds to address stormwater at 6140 Highway 10. Because the <br />stormwater review found on -site (private) stormwater retention is required, the plans only include providing the <br />necessary service line to the right of way, for a future improvement. <br />Recommendation: <br />On March 18, 2025, the Ramsey Public Works Committee recommended City Council approve the plans and <br />specifications and authorize advertisement for bids for Dickenson's Mississippi Estate Street Reconstructions, <br />Improvement Project #25-04, including the alternate bid to replace the watermain between Rivlyn Avenue and <br />Riverdale Drive. Additionally, the committee directed staff to continue working with Lano Equipment to solve the <br />stormwater runoff concerns from their site. The committee did not support City compensation to Lano for <br />addressing their onsite stormwater. <br />City staff recommended approving the plans and specifications and authorizing advertisements for bids for said <br />improvements and alternate bid. If staff is unable to obtain the necessary easements prior to City Council <br />considering awarding the construction contract, staff recommends not proceeding with alternate bid, and <br />performing the work at a later date. <br />Outcome/Action: <br />Adopt Resolution #25-061 approving plans and specifications and authorizing advertisement for bids for <br />Dickenson's Mississippi Estate Street Reconstructions, Improvement Project #25-04. <br />Attachments <br />Res 25-061 <br />25-04 Temporary Easement Exhibit <br />25-04 Title Sheet <br />25-04 Typical Sections <br />25-04 Street Summary <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 03/20/2025 12:47 PM <br />Brian Hagen Brian Hagen 03/20/2025 12:53 PM <br />Form Started By: Joe Feriancek Started On: 03/13/2025 02:58 PM <br />Final Approval Date: 03/20/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.