GPR was performed in 2020 at the time the streets averaged 3.3 to 3.7 inches of bituminous over 4.1 to 6.6 inches <br />of aggregate base. <br />Staff review of the geotechnical report found clean sands, ideal for pavement support within the project area. <br />Additionally, groundwater is not anticipated to be a concern for the street reconstruction. <br />Proposed Improvements <br />The bituminous curbing is proposed to be replaced with surmountable concrete curb and gutter. At driveways, a <br />curb cut similar to what is typically placed in B-style curb will be placed to avoid a high transition from the <br />roadway to driveways. The new pavement section will include 3.5-inches of new bituminous pavement over <br />4-inches of aggregate base. The aggregate base is proposed to be made of recycled reclamation. <br />The Xenolith Street flume is proposed to be replaced with a new concrete flume, only minor grading to the <br />existing swale to tie-in is proposed. There is not sufficient depth to convert this flume to a storm sewer inlet and <br />run piping to the existing pond. The 159 th Lane flume is proposed to be replaced with storm sewer inlets and <br />piping running to the existing pond, which has sufficient depth to handle the pipe system. <br />Restoration of the impacted boulevards will include a minimum of 4-inches topsoil and hydroseed with a <br />residential turf seed mix. Though the pavement is generally going back to the same location and elevation, <br />driveway aprons will be replaced to match into the new concrete curb and gutter. In general, the boulevard <br />impacts and driveway impacts will occur within 6 feet of the existing pavement. <br />Preliminary Schedule Remaining <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o April 8, 2025 <br />• Contractor Begins Construction <br />o Spring / Summer 2025 <br />• Contractor Substantially Completes Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o August 30, 2025 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o September 30, 2025 <br />Notification: <br />If Council accepts the bids and awards a contract for construction of the improvements, letters will be mailed to <br />property owners with updates on the project status. Engineering Staff maintains City Improvement project <br />webpages with the most current project information. <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff estimates up to 10 minutes will be needed to present this case and respond to questions. <br />Alternatives: <br />Alternative # 1 — Motion to adopt Resolution #25-070 awarding a contract to Park Construction Company in the <br />amount of $423,698.35 for Sorteberg's Street Reconstructions, Improvement Project #25-06. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />