Laserfiche WebLink
5. 16. <br />CC Regular Session <br />Meeting Date: 06/ 11 /2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title <br />Adopt Resolution #24-159 Approving Plans and Authorizing Requests for Quotes for Improvement Project <br />#24-561 Lift Station No. 1 Permanent Generator <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #24-159 approving plans and authorizing requests for quotes for <br />Improvement Project #24-56, Lift Station No. 1 Permanent Generator. <br />Background: <br />The 2024 — 2033 Capital Improvement Program includes proposed project #24-SEW-002, Lift Station No. <br />Rehab and Generator, proposed for construction in 2025 at an estimated cost of $175,000. <br />This project proposes to rehabilitate sanitary sewer Lift Station No. 1, which is located at 13659 - 137th Avenue, <br />by replacing the original base elbows and forcemain, upsizing the pumps, and installing a permanent emergency <br />power supply generator on site. This work will serve to replace deteriorating pipes and fittings, to accommodate <br />increased sewage flowrates that have occurred since the lift station was constructed in 1990, and to prevent <br />sewage from backing up into businesses and residences served by this and other lift stations during major power <br />outages. <br />During power outages, staff tows a portable generator on a trailer to this and other lift stations that don't have <br />permanent generators. Staff pumps each station down, then disconnects the generator and moves to the next <br />station, and repeats the process until power is restored. However, due to the constant and heavy sewage flowrates <br />processed through this station, staff would not have the ability to disconnect the portable generator in the event of <br />a long-term power outage, leaving other lift stations without power and possibly backing sewage up into <br />neighboring homes and businesses. <br />On April 9, 2024, City Council approved a proposal from Bolton & Menk, Inc. in the not -to -exceed amount of <br />$26,400 to design the permanent emergency power supply generator and prepare plans and specifications for <br />rehabilitating the lift station and constructing improvements necessary to accommodate the permanent generator, <br />apply for permits, administer the bid process, and provide construction related services. <br />Plans are now complete and staff is requesting approval to submit requests for quotes to the contractors that <br />complete this type of work. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />