My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:15:37 PM
Creation date
4/8/2025 4:02:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nEs <br />www.ae2s.com <br />AE2S has reviewed this remaining contingency balance and would offer the following <br />observations/considerations. <br />1. AE2S has received 192 submittals for this project. These submittals are intended to allow the <br />design team to review the final installation and scope of the various components of the project <br />prior to fabrication and installation. This process allows the team to work directly with the <br />contractor and the suppliers to make any final adjustments that are needed to accommodate the <br />equipment that was selected for the project. This is an important step in the construction process <br />because of the complicated nature of the facility and the variation in equipment options. <br />Completing this step significantly reduces the chances of change orders. In comparison with recent <br />projects of similar size and scope AE2S believes that a majority of the submittals have been <br />received for the project and the remaining submittals will be less significant in scope to the project. <br />The following projects were used for comparison. <br />a. Reference projects: <br />i. Shoreview WTP (8MGD iron and Manganese WTP) = 170 submittals <br />ii. Robbinsdale Lime Softening WTP (substantially more equipment and <br />complicated design) = 273 submittals <br />2. AE2S has a history of delivering projects of this nature with change orders being less <br />than 3 % of the total project cost. The general construction contingency for this project <br />($950,000) is approximately 3.1 % of the base construction cost of $30,578,500. For <br />reference, AE2S completed the following similar projects with the final costs as noted <br />below: <br />Project <br />Original Contract <br />Value <br />Total Change <br />Orders <br />Shoreview 8MGD WTP <br />$9192000 <br />$119,446 1.2%) <br />MMU Softening Enhancement Project <br />9162000 <br />204,281 2.1% <br />[Robbinsdale 3.5MGD Softening WTP <br />$311820,400 <br />$765,288 2.4% <br />Based on the items noted above AE2S feels that Ramsey's project is progressing well and is not likely to <br />require additional funding to cover change orders beyond what is already reserved in the construction <br />contingency allowance. AE2S will continue to review project status and work with the contractor to <br />manage the project in the Best interests of Ramsey. Should you have any further questions please do not <br />hesitate to contact me at my e-mail Aaron.Vollmer@ae2s.com or on my cell phone at 612-719-5015 <br />Submitted in Service, <br />AE2S <br />Aaron Vollmer <br />Project Manager <br />Advanced Engineering, and Environmental Services, Inc.. <br />1 East Fish Lake Road, Suite 184 . Water Tower Plano Business Center * Maple Grove, MN 55369 • 76 -46 -50 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.