Laserfiche WebLink
23-STR-009 <br />2025 thru 2034 <br />Riverside West Street Reconstruction <br />Project Name <br />a) a) <br />E E <br />> > <br />0 0 <br />L L <br />0_ 0 <br />E E <br />L L <br />▪ U) <br />Total Project Cost <br />1-Existing Obligation (High) <br />L <br />co <br />) <br />co <br />Useful Life <br />0 <br />0 <br />•0 <br />0 <br />0 <br />Reconstruction of 137th Avenue and Dolomite Street within the Riverside West subdivision. <br />Justification <br />In accordance with the City's Pavement Management Program, each paved street within the City is scheduled to receive preventative maintenance on a regularly scheduled basis, including reconstruction at the end of its useful life, <br />which is estimated to be 60 years based on the City's predominant sand subgrades. <br />rlil, c� CO(IOn <br />• cfl co +r • W 01 W <br />▪ N N ▪ a) N N <br />N N r-I N <br />• O O .4 coo <br />M M <br />0 0 <br />N N <br />(Y) o o of) coo <br />M M <br />0 0 <br />N N <br />N 0 0 N 0 0 0 <br />M M <br />0 0 <br />N N <br />rI o o r-I coo <br />M M <br />0 0 <br />N N <br />O o o O O o o <br />O O <br />N N <br />O o o O o 0 0 <br />N N <br />0 0 <br />N N <br />CO N o o CO N O o o <br />0 N <br />N o o N. coo <br />0 0 N <br />N N N <br />N in in <br />O CD CO <br />N N N <br />N N <br />CO N In In <br />O cD CD co <br />N N N <br />r-I N <br />00 O O LO O O O <br />N N <br />0 0 <br />N N <br />Expenditures <br />Improvements Other than Building Cost <br />LL ) <br />Pavement Management Fund <br />Storm Water Utility Fund <br />Produced Using Plan -It CIP Software <br />