Laserfiche WebLink
23-STR-008 <br />2025 thru 2034 <br />Section 01 Unplatted (S/O CR 27) Street Recon <br />Project Name <br />E E <br />a) a) <br />> > <br />0 0 <br />L L <br />0_ 0 <br />E E <br />O 0 <br />0 0 <br />L L <br />(%) U) <br />Total Project Cost <br />Improvement <br />1-Existing Obligation (High) <br />a) L: <br />0_0 <br />L <br />) <br />co <br />a) <br />0 <br />CO <br />Useful Life <br />0 <br />0 <br />•0 <br />0 <br />0 <br />Reconstruction of the streets within Section 01 Unplatted, south of CR 27. <br />Justification <br />In accordance with the City's Pavement Management Program, each paved street within the City is scheduled to receive preventative maintenance on a regularly scheduled basis, including reconstruction at the end of its useful life, <br />which is estimated to be 60 years based on the City's predominant sand subgrades. <br />03 CD N <br />O N r-I .1 <br />I— CO M r-1 <br />00 r-I 0 <br />ri <br />1- 0 0 l• O O 0 <br />M M <br />0 0 <br />N N <br />M o o M coo <br />M M <br />0 0 <br />N N <br />CV o o N o 0 0 <br />M M <br />0 0 <br />N N <br />r-I o o r-I coo <br />M M <br />0 0 <br />N N <br />0 0 0 0 0 o o <br />M M <br />0 0 <br />N N <br />a) 0 0 a) 0 0 0 <br />N N <br />0 0 <br />N N <br />CO 0 0 CO 0 o o <br />0 0 <br />N N <br />N o o N. coo <br />0 0 <br />N N N <br />N N co m <br />0 0 co o <br />r-I r-I r-I <br />00 o o 00 o o o <br />N N <br />0 0 <br />N N <br />Expenditures <br />Improvements Other than Building Cost <br />LL ) <br />Pavement Management Fund <br />Storm Water Utility Fund <br />Produced Using Plan -It CIP Software <br />