Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2015 thru 2019 <br />Project # 15-STM-004 <br />Project Name Alpine Drive Reconstruction <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improveme <br />Description <br />Department Stormwater Utility <br />Contact <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $60,700 <br />econstruction of Alpine Drive from Armstrong Boulevard to Variolite Street <br />Total Project Cost = $772,300 <br />Street Improvement: $711,600 <br />Storm Water Improvement: $ 60,700 <br />Justification <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />applied. This project will install concrete curb and gutter and storm sewer. <br />Expenditures <br />2015 2016 2017 2018 2019 Total <br />Improvements Other than <br />Building Cost <br />60,700 60,700 <br />Total <br />Funding Sources <br />60,700 60,700 <br />2015 2016 2017 2018 2019 Total <br />Storm Water Utility Fund 60,700 60,700 <br />Total <br />60,700 60,700 <br />Page 146 <br />