Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2015 thru 2019 <br />Project # 15-STM-005 <br />Project Name Reconstruction Streets -Stanhope Terr & North Forty <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improveme <br />Description <br />Department Stormwater Utility <br />Contact <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $587,600 <br />Reconstruction of streets in Stanhope Terrace: Ute Street, 153rd Lane, 154th Lane <br />North Forty: 163rd Lane, Alpaca st, Chameleon St. <br />Total Project Cost = $ 1,939,400 <br />Street Improvement: $1,351,800 <br />Storm Water Improvments: $ 587,600 *** <br />NOTE: Depending on what happens with funding for Andrie Street in 2016 may not be funding in storm utility fund for this project. <br />Justificatio n <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />applied. This project will install concrete curb and gutter and storm sewer. <br />Expenditures <br />2015 2016 2017 2018 2019 Total <br />Improvements Other than <br />Building Cost <br />587,600 587,600 <br />Total <br />587,600 587,600 <br />Funding Sources 2015 2016 2017 2018 2019 Total <br />Storm Water Utility Fund 587,600 587,600 <br />Total <br />587,600 587,600 <br />Page 147 <br />