LANDSCAPE SPECIFICATIONS
<br />1. TREE PROTECTION. ALL TREES NOT SPECIFICALLY NOTED OR MARKED ON SITE FOR REMOVAL SHALL REMAIN PROTECTED AND
<br />UNDISTURBED DURING CONSTRUCTION. TREE PROTECTION SHALL EXTEND TO THE DRIP LINE, WITHIN WHICH NO CONSTRUCTION
<br />ACTIVITY, MATERIAL STORAGE, OR VEHICLE PARKING SHALL BE PERMITTED. TREE PROTECTION FENCING SHALL BE ERECTED PRIOR
<br />TO CONSTRUCTION START PER PLANS OR AS DIRECTED BY OWNER/LANDSCAPE ARCHITECT AND SHALL CONSIST OF 4' TALL
<br />HEAVY DUTY ORANGE CONSTRUCTION FENCING WITH 6' STEEL FENCE POSTS SPACED 6' O.C. MAX.
<br />2. EROSION CONTROL. REFER TO CIVIL PLAN SHEETS FOR STORMWATER POLLUTION PREVENTION PLAN (SWPPP), AND TEMPORARY
<br />AND PERMANENT STORMWATER BMPS, INCLUDING SILT FENCE, BIO-ROLLS, INLET PROTECTION, EROSION CONTROL BLANKETING,
<br />DUST CONTROL, SWEEPING AND ROCK CONSTRUCTION ENTRANCE. ALL DISTURBED AREAS SHALL RECEIVE PERMANENT
<br />STABILIZATION IN ACCORDANCE WITH THE LANDSCAPE PLAN WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE DISTURBED
<br />AREA HAS CEASED. IN THE EVENT PERMANENT STABILIZATION CANNOT BE IMPLEMENTED WITHIN 7 DAYS, TEMPORARY
<br />STABILIZATION BMPS MUST BE IMPLEMENTED WITHIN 7 DAYS USING.
<br />3. CLEARING AND GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING ALL AREAS INDICATED AS BEING
<br />DISTURBED OR OTHERWISE SHOWN ON PLANS. CLEARING AND GRUBBING SHALL INCLUDE REMOVAL AND DISPOSAL OF ALL TREES,
<br />STUMPS, BRUSH, GRASS, ROOTS AND OTHER ORGANIC MATERIAL AT AN APPROVED OFF -SITE DISPOSAL LOCATION.
<br />4. SOIL PREPARATION. REFER TO GEOTECHNICAL REPORT FOR ANY REQUIRED SOIL CORRECTIONS, AMENDMENTS OR ADDITIONAL
<br />INFORMATION (IF APPLICABLE). EXISTING TOPSOIL SHALL BE STRIPPED FROM ALL DISTURBED AREAS AND STOCKPILED IN AN
<br />APPROVED LOCATION FOR RE -SPREAD. ALL AREAS WHERE SOIL HAS BEEN COMPACTED BY CONSTRUCTION ACTIVITY AND THAT
<br />ARE INDICATED TO BE SODDED, SEEDED OR PLANTING BED SHALL BE DE -COMPACTED TO A MINIMUM DEPTH OF 12 INCHES BY
<br />SOIL RIPPING, TILLING OR OTHER APPROVED SOIL LOOSENING METHOD.
<br />5. TOPSOIL MATERIAL. ALL EXISTING, AMENDED OR IMPORTED TOPSOIL SHALL MEET THE REQUIREMENTS OF MNDOT TOPSOIL TYPE A.
<br />A MINIMUM 4 INCH DEPTH OF TOPSOIL SHALL BE PLACED ON ALL AREAS TO BE SODDED OR SEEDED. A MINIMUM 12 INCH DEPTH
<br />OF TOPSOIL SHALL BE PLACED WITHIN ALL PLANTING BED AREAS. ALL TOPSOIL SHALL BE FINE GRADED, RAKED AND DRAGGED
<br />TO PROVIDE A SMOOTH, UNIFORM SURFACE. TOPSOIL GRADES SHALL BE WITHIN .1 FEET OF INDICATED FINISHED GRADE AND
<br />SHALL BE TRUE TO GRADIENTS SHOWN ON PLANS. REFER TO CIVIL PLAN SHEETS FOR FILTRATION BASIN SOIL REQUIREMENTS.
<br />6. SEEDING AND TURF ESTABLISHMENT. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES
<br />AND TOPSOIL PREP PRIOR TO SEEDING. APPLY 12-12-12 GRANULAR STARTER FERTILIZER AT A RATE OF 250 LBS PER ACRE
<br />PRIOR TO SEEDING.. SEEDS SHALL BE SOWED IN 2 PERPENDICULAR PASSES, EACH PASS AT ONE-HALF THE INDICATED RATE, VIA
<br />BROADCAST SPREADER, DROP SEEDER OR DRILL SEEDER. FOLLOWING SEED APPLICATION, INSTALL TYPE 3N EROSION CONTROL
<br />BLANKET ON ALL SLOPES GREATER THAN 4:1. IN ALL OTHER AREAS, APPLY HYDROMULCH COVER (MUST BE A SEPARATE
<br />OPERATION FROM SEEDING) AT A TARGETED DRY WEIGHT RATE OF 3500 LBS PER ACRE. SOIL SHALL BE KEPT MOIST DURING
<br />ESTABLISHMENT WITH ADDITIONAL RE -SEEDING AS NECESSARY TO ACHIEVE A HEALTHY, UNIFORM STAND OF GRASS, FREE OF
<br />WEEDS AND WITH COVERAGE EXCEEDING 75% IN ANY 10'x10' AREA PRIOR TO FINAL ACCEPTANCE.
<br />7. SODDING. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES AND TOPSOIL PREP PRIOR
<br />TO SODDING. APPLY 12-12-12 GRANULAR STARTER FERTILIZER AT A RATE OF 250 LBS PER ACRE PRIOR TO SODDING AND ROLL
<br />TOPSOIL TO CREATE A UNIFORM SURFACE FOR LAYING SOD. SOD SHALL NOT BE CUT MORE THAN 24-HOURS IN ADVANCE OF
<br />INSTALLATION. CONTRACTOR SHALL KEEP SOD MOIST FOR A MINIMUM OF 30 DAYS AND SHALL BE RESPONSIBLE FOR MAINTAINING
<br />THE SOD UNTIL FINAL ACCEPTANCE.
<br />8. PLANT MATERIAL. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," ANSI-Z60,
<br />LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS
<br />FOR PLANT MATERIALS. OWNER/LANDSCAPE ARCHITECT RESERVE THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED
<br />UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. NO SUBSTITUTION OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS
<br />APPROVED IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
<br />9. PLANT MATERIAL SUBSTITUTIONS. ALL REQUESTS FOR PLANT SUBSTITUTIONS SHALL BE MADE IN WRITING TO THE
<br />OWNER/LANDSCAPE ARCHITECT AND MUST BE APPROVED BY THE CITY.
<br />10. PLANT INSTALLATION AND ESTABLISHMENT. REFER TO STANDARD PLANTING DETAILS. CONTRACTOR SHALL STAKE TREE LOCATIONS
<br />FOR APPROVAL BY OWNER/LANDSCAPE ARCHITECT PRIOR TO PLANTING. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR
<br />DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH
<br />MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE.
<br />NOTE,
<br />SEE PLANTING NOTES FOR THE
<br />PLAN
<br />8" 2-PLY NYLON STRAPS
<br />DOUBLE STRAND 12 GAUGE WIRE
<br />PAINTED FLUORESCENT ORANGE
<br />UJI-IITE FLAGGING (TYP.)
<br />TREE WRAP
<br />4 INCHES HARDWOOD MULCH
<br />4 INCI-I DEEP SAUCER
<br />8' STEEL TEE POST-
<br />3 REQUIRED AT 120
<br />BAGKFILL MIX
<br />UNDISTURBED SUBSOIL
<br />REMOVE BURLAP ir ROPE
<br />FROM TOP 1 /3 OF THE BALL
<br />TYPE OF MULCH MATERIAL TO USE.
<br />E
<br />DECIDUOUS TREE PLANTING DETAIL
<br />NOT TO SCALE
<br />11. MULCH MATERIAL. DOUBLE SHREDDED HARDWOOD MULCH OR ROCK MULCH AS INDICATED ON PLANS. ALL MULCH SHALL BE
<br />CLEAN AND FREE OF NOXIOUS WEEDS, SOIL, OR OTHER DELETERIOUS MATERIAL, AND SHALL BE INSTALLED OVER A NON -WOVEN
<br />GEOTEXTILE FABRIC (INCIDENTAL) OR OTHER APPROVED WEED BARRIER TO A MINIMUM SETTLED DEPTH OF 4". MULCH SHALL BE
<br />HELD BACK FROM PLANT STEMS/TRUNKS A MINIMUM OF 3". WOOD MULCH SHALL BE PLACED AROUND INDIVIDUAL TREES TO A 4'
<br />MINIMUM DIAMETER. MULCH SHALL BE INSTALLED WITHIN 48-HOURS OF PLANT INSTALLATION.
<br />12. LANDSCAPE EDGING. INSTALL LANDSCAPE EDGING BETWEEN ALL MULCH AREAS AND TURF. EDGING SHALL BE COMMERCIAL GRADE
<br />BLACK POLYETHYLENE OR VINYL EDGING, 0.1 INCH THICK BY 5 INCHES DEEP, V-LIPPED BOTTOM, HORIZONTALLY GROOVED,
<br />1-INCH ROUND TOP, EXTRUDED IN STANDARD LENGTHS, WITH 9-INCH STEEL ANGLE STAKES.
<br />13. IRRIGATION. DESIGN, FURNISH AND INSTALL A COMPLETE UNDERGROUND IRRIGATION SYSTEM FROM APPROVED
<br />POINT(S)-OF-CONNECTION WITHIN THE SITE COVERING ALL TURF AND PLANTING AREAS AS SHOWN ON THE LANDSCAPE PLAN.
<br />INCLUDES FLOW/PRESSURE TESTING, PLANS WITH DESIGN CALCULATIONS, AS -BUILT DRAWINGS, LABOR, MATERIALS, EQUIPMENT,
<br />AND SERVICES FOR THE TESTING, ADJUSTING, RETESTING AND READJUSTING AS REQUIRED TO PLACE THE SYSTEM IN AN
<br />APPROVED OPERATING CONDITION. THE IRRIGATION SYSTEM SHALL INCLUDE THE DESIGN AND INSTALLATION OF THE FOLLOWING:
<br />PIPING, METER AND BACKFLOW ASSEMBLIES, SPRINKLER HEADS, CABINETS, VALVES AND VALVE BOXES, CONTROLLERS, CONTROL
<br />WIRING, FITTINGS, ELECTRICAL CONNECTIONS, QUICK -COUPLERS, ALL OTHER NECESSARY ACCESSORIES, SYSTEM MANUALS, 1-YEAR
<br />MAINTENANCE PERIOD INCLUDING 1 FALL WINTERIZATION AND 1 SPRING START-UP. IRRIGATION PLANS TO BE PREPARED BY A
<br />QUALIFIED IRRIGATION DESIGNER AND SUBMITTED TO OWNER/LANDSCAPE ARCHITECT FOR APPROVAL.
<br />14. MAINTENANCE. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL
<br />SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE,
<br />AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE MOWING, TRIMMING, WATERING,
<br />FERTILIZING, WEED AND PESTICIDE CONTROL, MULCHING, REMOVAL OF DEAD MATERIALS, RE -SETTING PLANTS TO PROPER GRADE
<br />AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES,
<br />HOWEVER, THE CONTRACTOR SHALL RETAIN RESPONSIBILITY FOR ALL PLANT MATERIAL THROUGH THE COMPLETION OF THE
<br />WARRANTY PERIOD.
<br />15. WATERING. UPON ESTABLISHMENT OF SEED AND INSTALLATION OF PLANTS, CONTRACTOR SHALL MAINTAIN A WATERING SCHEDULE
<br />WHICH WILL THOROUGHLY WATER ALL PLANTS AND TURF AREAS A MINIMUM OF ONCE A WEEK. MORE FREQUENT WATERING MAY
<br />BE REQUIRED DURING PERIODS OF HOT, DRY WEATHER. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER.
<br />IN THE ABSENCE OF PERMANENT IRRIGATION, TEMPORARY IRRIGATION, TREE WATERING BAGS, OR HAND -WATERING ARE
<br />ACCEPTABLE.
<br />16. NATIVE PLANT ESTABLISHMENT. THIS PROJECT INCLUDES ONE OR MORE NATIVE PLANT SEED MIXES CONSISTING OF A VARIETY OF
<br />GRASSES, SEDGES AND FLOWERING FORBS. BECAUSE THESE PLANTS TYPICALLY HAVE A LONGER GERMINATION PERIOD, A COVER
<br />CROP SPECIES IS REQUIRED TO PROVIDE TEMPORARY COVER AND STABILIZATION. MAINTENANCE OF THESE SEEDED AREAS IS
<br />CRITICAL DURING THE FIRST SEVERAL YEARS TO ESTABLISH A SUCCESSFUL NATIVE PLANT COMMUNITY. SEEDED AREAS SHALL BE
<br />MOWED / WEED -WHIPPED TO A HEIGHT OF 6-10 INCHES IN MID-JULY AND EARLY SEPTEMBER DURING THE FIRST 2-3 YEARS
<br />OF ESTABLISHMENT. IN ADDITION, ALL NON-NATIVE SPECIES / WEEDS SHALL BE SPOT SPRAYED NO LESS THAN 3 TIMES A YEAR
<br />WITH HERBICIDE BY A LICENSED APPLICATOR. RE -SEEDING AS NECESSARY SHALL OCCUR IN MAY. A NATIVE PLANT COMMUNITY
<br />SHALL BE CONSIDERED SUCCESSFULLY ESTABLISHED NO SOONER THAT 3 YEARS AFTER INITIAL SEEDING - ONCE THE COVER
<br />CROP HAS BEEN SUFFICIENTLY REPLACED BY NATIVE PLANTS AND THE AREA IS FREE OF ALL NON-NATIVE AND INVASIVE
<br />SPECIES. AT THIS TIME, MAINTENANCE CAN BE REDUCED TO MOWING / WEED -WHIPPING TO A HEIGHT OF 6-10 INCHES ONCE A
<br />YEAR IN EARLY SEPTEMBER AND SPOT SPRAYING OF HERBACIDE ONLY AS NEEDED.
<br />17. FINAL ACCEPTANCE. UPON SUBSTANTIAL COMPLETION OF THE WORK, CONTRACTOR SHALL REQUEST FINAL ACCEPTANCE OF THE
<br />WORK IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT. IF ANY WORK IS FOUND TO BE INCOMPLETE OR UNSATISFACTORY IN
<br />THE OPINION OF THE OWNER/LANDSCAPE ARCHITECT, A WRITTEN PUNCH LIST WILL BE PREPARED LISTING ALL ITEMS THAT
<br />REQUIRE COMPLETING OR CORRECTING BEFORE FINAL ACCEPTANCE.
<br />18. WARRANTY. ALL PLANTS, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR FROM THE DATE OF FINAL
<br />ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR
<br />AND MATERIAL.
<br />NOTE: GUY ASSEMBLY OPTIONAL BUT
<br />CONTRACTOR ASSUMES FULL
<br />RESPONSIBILITY FOR MAINTAINING TREE
<br />IN A PLUMB POSITION FOR THE
<br />DURATION OF THE GUARANTEE PERIOD
<br />GUY ASSEMBLY- 16"
<br />POLYPROPYLENE OR POLYETHYLENE
<br />(40 MIL)1-1/2" WIDE STRAP (TYP)
<br />DOUBLE STRAND 10 GA. WIRE, 2-1"
<br />ROLLED STEEL POSTS (MNDOT 3401)
<br />180° O.G. (SEE STAKING DIAGRAM)
<br />COORDINATE
<br />STAKING TO INSURE
<br />• UNIFORM
<br />ORIENTATION OF GUY
<br />LINES AND STAKES
<br />•
<br />STAKING DIAGRAM
<br />GUY WIRE UWITI-I WEBBING
<br />FLAGGING- ONE PER WIRE
<br />4'-6' SHREDDED BARK
<br />MULCH
<br />EXISTING GRADE
<br />MINIMUM 1/2 WIDTH OF ROOT BALL
<br />PLANTING SOIL MIXTURE (SEE SPEC.)
<br />UNDISTURBED OR STABILIZED
<br />SUBSOIL
<br />®CONIFEROUS TREE PLANTING DETAIL
<br />NOT TO SCALE
<br />PLANTING STEPS FOR DECIDUOUS AND CONIFEROUS TREES
<br />I. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING.
<br />2. TRIM OUT DEAD WOOD AND WEAK AND/OR DEFORMED TWIGS. DO NOT
<br />CUT A LEADER. DO NOT PAINT CUTS.
<br />3. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY
<br />COMPACTED BAGKFILL SOIL INSTALL PLANT SO THE ROOT FLARE IS AT
<br />OR UP TO 2" ABOVE THE FINISHED GRADE.
<br />4. PLACE PLANT IN PLANTING HOLE UWITI-I BURLAP AND WIRE BASKET, (IF
<br />USED), INTACT. BAGKFILL WITHIN APPROXIMATELY 12" OF THE TOP OF
<br />ROOTBALL, WATER PLANT. REMOVE TOP 1/3 OF THE BASKET OR THE
<br />TOP TWO HORIZONTAL RINGS, WHICHEVER IS GREATER. REMOVE ALL
<br />BURLAP AND NAILS FROM TOP 1/3 OF THE BALL. REMOVE ALL TWINE.
<br />5. PLUMB AND BAGKFILL WITH BAGKFILL SOIL
<br />6. WATER TO SETTLE PLANTS AND FILL VOIDS.
<br />1. WATER WITHIN TWO HOURS OF INSTALLATION. WATERING MUST BE
<br />SUFFICIENT TO THOROUGHLY SATURATE ROOT BALL AND PLANTING HOLE.
<br />8. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL
<br />MOISTURE IS EXCESSIVE.
<br />4 INCHES MULCH
<br />( SEE LANDSCAPE NOTES
<br />FOR TYPE OF MULCH )
<br />IF SHRUB 15 B B, THEN
<br />REMOVE BURLAP it ROPE
<br />FROM TOP 1/3 OF BALL
<br />BAGKFILL MIX
<br />UNDISTURBED SUBSOIL
<br />O
<br />SHRUB & CONTAINER PLANTING DETAIL
<br />NOT TO SCALE
<br />PLANT SCHEDULE
<br />SYMBOL
<br />CODE
<br />QTY
<br />BOTANICAL NAME
<br />COMMON NAME
<br />SIZE
<br />CONTAINER
<br />TREES
<br />•
<br />RM
<br />9
<br />Acer rubrum 'Northwood'
<br />Northwoods Red Maple
<br />2" Cal.
<br />B&B
<br />10
<br />FM
<br />4
<br />Acer x freemanii 'Sienna'
<br />Sienna Glen Maple
<br />2" Cal.
<br />B&B
<br />RB
<br />2
<br />Betula nigra
<br />Clump Form, 2" Cal Equivalent
<br />River Birch Multi -Trunk
<br />8' Ht.
<br />B&B
<br />•
<br />• •
<br />fp'
<br />HL
<br />3
<br />Gleditsia triacanthos inermis ' Harv&
<br />Northern Acclaim Thornless Honey Locust
<br />2" Cal.
<br />B&B
<br />410
<br />KC
<br />4
<br />Gymnocladus dioica 'Espresso'
<br />Kentucky Coffeetree
<br />2" Cal.
<br />B&B
<br />WO
<br />7
<br />Quercus bicolor
<br />Swamp White Oak
<br />2" Cal.
<br />B&B
<br />rt,
<br />BL
<br />7
<br />Tilia americana 'Boulevard'
<br />Boulevard Linden
<br />2" Cal.
<br />B&B
<br />•
<br />AE
<br />4
<br />Ulmus americana 'Princeton'
<br />American Elm
<br />2" Cal.
<br />B&B
<br />CONIFEROUS TREES
<br />OF6
<br />BF
<br />10
<br />Abies balsamea
<br />Balsam Fir
<br />6' Ht.
<br />B&B
<br />\0\11JJI//%
<br />• =
<br />//// I I II\\\\
<br />BH
<br />9
<br />Picea glauca densata
<br />Black Hills Spruce
<br />6' Ht.
<br />B&B
<br />WC
<br />7
<br />Thuja occidentalis
<br />White Cedar
<br />6' Ht.
<br />B&B
<br />ORNAMENTAL TREES
<br />AligeAmelanchier
<br />WSB
<br />.CA
<br />6
<br />x grandiflora 'Autumn Brilliance'
<br />Clump Form, 1.5" Cal Equivalent
<br />Autumn Brilliance Serviceberry
<br />7' Ht.
<br />B&B
<br />3
<br />Malus x'Adirondack'Adirondack
<br />White Flowers
<br />Crabapple
<br />1.5" Cal.
<br />B&B
<br />♦
<br />JL
<br />6
<br />Syringa reticulata 'Ivory Silk
<br />White Flowers
<br />Ivory Silk Japanese Tree Lilac
<br />1.5" Cal.
<br />B&B
<br />��
<br />GROUND COVERS
<br />11111-
<br />1
<br />111-
<br />SOD
<br />41,789 sf
<br />Bluegrass Sod
<br />Irrigated Turfgrass
<br />Kentucky Bluegrass
<br />sod
<br />TI
<br />16,517 sf
<br />Type I - Infiltration Basin Seed Mix
<br />Refer to notes for acceptable seeding
<br />methods.
<br />Seeding Rate 50.0 Ib/ac
<br />MnDOT Seed Mix 35-241
<br />seed
<br />TII
<br />15,357 sf
<br />Type II - No -Mow Lawn Seed Mix
<br />Refer to notes for acceptable seeding
<br />methods.
<br />Seeding Rate 300.0 Ib/ac
<br />Prairie Nursery No -Mow Lawn Seed Mix
<br />seed
<br />/ / / / / / / /
<br />/ / / / / / / /
<br />/ / / / / / / /
<br />""""
<br />////////
<br />TIII
<br />18,265 sf
<br />Type III - Native Construction Seed Mix
<br />Install with mass grading. Refer to notes for
<br />acceptable seeding methods.
<br />Seeding Rate 57.0 Ib/ac
<br />MnDOT Seed Mix 32-241
<br />seed
<br />CARLSON
<br />ENGINEERING
<br />ENGINEERING
<br />SURVEYING
<br />PLANNING
<br />3890 PHEASANT RIDGE DR NE
<br />SUITE 100
<br />BLAINE, MN 55449
<br />TEL 763.489.7900
<br />FAX 763.489.7959
<br />CARLSON- ENGINEERING.CO M
<br />I hereby certify that this plan, specification
<br />or report was prepared by me or under my
<br />direct supervision and that I am a duly
<br />Licensed Landscape Architect under
<br />the laws of the State of Minnesota
<br />Print Name: Ryan J. Ruttger, RLA
<br />Signature:
<br />Date: 12/06/22 License #: 56346
<br />Drawn: RJR
<br />Designed: RJR
<br />Date: 12/06/22
<br />Revisions:
<br />1. 12/20/22 - Per City Comments
<br />2. 03/27/24 - Revise to SOG per Owner
<br />3. 04/29/25 - Per City Comments
<br />LGI HOMES - MINNESOTA, LLC
<br />2850 Cutters Grove Ave., Suite 207
<br />Anoka, Minnesota 55303
<br />RIVENWICK VILLAGE
<br />4TH ADDITION
<br />Ramsey, Minnesota
<br />LANDSCAPE PLAN
<br />L2
<br />of
<br />2
<br />Save Date: 03/27/241 f:\Iobs\7821 - 7840\7835-02 nvenwick 4th addition\cad c3d\landscape\7835-02_landscape.dwg
<br />7835-02
<br />
|