Laserfiche WebLink
2 <br />0 <br />25 <br />50 <br />75 <br />SCALE (FEED <br />5843 <br />-,DI <br />(1I <br />0 <br />0 <br />,1 =I <br />m <br />HI <br />SAWCUT FULL-DEP. N I(51 LF) <br />/ �I <br />DI <br />g5 N BBP <br />�gR <br />.5 <br />u � mommarsirmimfr <br />274+00 <br />5803 <br />REMOVE LOOP DETECTOR <br />CONTRACTOR SHALL COORDINATE WITH / <br />ANOKA COUNT <br />po <br />ALT BID - REMOVE PAVEMENT- BIT (96SY) <br />SAWCUT FULL -DEPTH (28 LF) 15315 J� ALT BID — RECLAIM BIT. TRAIL <br />T TO REMOVE LOOP DETECTOR /532i9 1 <br />REMOVE PAVEMENT BIT. (106 SY) • ar ► <br />RECLAIM BITUMINOUS PAVEMENT /'� \I 1 I <br />FULL -DEPTH o I SAWCUT FULL DEPTH (72 LF)I k ••) �� REMOVE CONCRETE CURB &GUTTER (TYP.) b9z d R ��� 0 y1, fill I,. A !` ��p ,.,.,�tri,..7,��tik.....ww:\_, <br />wAzzeir <br />aimarwarAtiiii. <br />281+00 - <br />rJ <br />_ - - <br />P BUR--_---888,, FBun__r <br />Ai ler zi r-44 <br />15,//,9; <br />FA <br />- - P-BUR <br />BUR — <br />• • r,9099 <br />1 <br />G <br />ALT BID - REMOVE PAVEMENT - CONCRETE (3 SY) <br />SAWCUT FULL -DEPTH (5 LF) <br />(„ <br />O <br />33' ELECTRICAL TRAN <br />DRAINAGE & UTILITY EASEMENT <br />C <br />ITION EASEMENT <br />PEP?DOC. NO.304917 <br />0 <br />co <br />G. <br />PID 233225420040 <br />• <br />ALT BID - RECLAIM BIT. TRAIL (1293 SY) <br />5787 <br />PARKWAY, TRAILWAY AND UTILITY -- <br />EASEMENT PER DOC.85130� <br />7 <br />5775 <br />2/ / <br />5763 <br />C <br />5751 <br />RECLAMATION - FULL DEPTH <br />RECLAMATION - FULL DEPTH (RAISE PROFILE AREA) <br />ALT BID - RECLAMATION - BIT TRAIL <br />REMOVE PAVEMENT- BITUMINOUS <br />ALT BID - REMOVE PAVEMENT - BITUMINOUS <br />REMOVE PAVEMENT- CONCRETE <br />ALT BID - REMOVE PAVEMENT - CONCRETE <br />MILL BITUMINOUS PAVEMENT <br />LEGEND <br />• <br />OH <br />P - BUR <br />X REMOVE TREE (INDIVIDUAL) FD <br />CONSTRUCTION LIMITS <br />ALT BID - CONSTRUCTION LIMITS <br />REMOVE STRUCTURE - STORM <br />REMOVE PIPE - STORM <br />REMOVE CONCRETE CURB & GUTTER <br />ALT BID - REMOVE CONCRETE CURB & GUTTER <br />SAWCUT PAVEMENT- FULL DEPTH <br />ALT BID - SAWCUT PAVEMENT FULL DEPTH <br />DRAINAGE & UTILITY EASEMENT LINE <br />RIGHT OF WAY LINE <br />SECTION LINE <br />TREE LINE <br />MAJOR CONTOUR <br />MINOR CONTOUR <br />OVERHEAD POWER LINE <br />BURIED POWER LINE <br />FIBER OPTIC LINE <br />COMMUNICATION LINE <br />GAS LINE <br />NOTE: <br />1. REMOVALS WILL BE MARKED IN THE FIELD BY CITY STAFF. ALL <br />REMOVALS MUST BE SAWCUT. <br />2. BITUMINOUS PATCHING IS INCIDENTAL TO THE REMOVE CONCRETE <br />CURB & GUTTER PAY ITEM. <br />3. PROTECT LANDSCAPING AND IRRIGATION. PROPERTY OWNERS ARE <br />TO LOCATE AND MOVE IRRIGATION BEFORE CONSTRUCTION. <br />4. PROTECT ALL EXISTING PAVEMENT NOT CALLED OUT FOR <br />REMOVAL. <br />DATE <br />REVISION <br />I hereby certify that this plan, specrfication, or report was prepared <br />by me or under my direct supervision and that I am a duly Licensed <br />Professional Engineer u erthelacs of the St of Minnesota <br />Joe Feria n/ek <br />Date 0 21/25 Lic No 57095 <br />DESIGNED BY: <br />DRAWN BY: <br />11F <br />11F <br />cnTE <br />03/21/25 <br />CHECKED BY: <br />11F <br />FILE <br />25-03 <br />CITY OF RAMSEY <br />7550 SUNWOOD DRIVE <br />RAMSEY, MN 55303 <br />(763) 427-1410 FAX (763) 433-9898 <br />EXISTING CONDITIONS & REMOVALS <br />S.A.P. 199-106-012 <br />ALPINE DRIVE RECONSTRUCTION <br />CITY PROJECT NO. 25-03 <br />CITY OF RAMSEY, MINNESOTA <br />SHEET <br />32 <br />84 <br />