My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 10/24/2006
Ramsey
>
Public
>
Minutes
>
Council
>
2006
>
Minutes - Council - 10/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 4:15:08 PM
Creation date
11/8/2006 3:31:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
10/24/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Mike Walz, General Contractor representing Northfork Office Condos, stated when city <br />sewer comes into the area they are looking at putting in additional buildings in the community <br />septic area. <br /> <br />Councilmember Pearson asked if there is a firm that will be monitoring the community septic <br />system. <br /> <br />Mr. Walz replied the firm that will be installing the well and septic system is in the works of <br />writing a maintenance contract. The firm will be available on an as need basis, as well as <br />quarterly monitoring. <br /> <br />Councilmember Elvig requested Fire Chief Kapler to address public safety. <br /> <br />Fire Chief Kapler reported there are currently two businesses in the City with a sprinkling system <br />on a private well, but they are single buildings; this development will include 15 buildings. Staff <br />has not seen a flow calculation yet, and it should be clear that the flow requirements will need to <br />be met. <br /> <br />Councilmember Cook inquired if water storage may be required on the site. <br /> <br />Fire Chief Kapler replied yes, but this is still early in the process. <br /> <br />Mayor Gamec pointed out there is usually a conditional use of the contract that requires hook up <br />when city sewer and water is available. <br /> <br />Community Development Director Trudgeon replied the development agreement as part of the <br />final plat includes the requirement to hook up within two years of city sewer and water being <br />available. <br /> <br />Mr. Walz indicated there will be main stubs located at 156th Avenue. <br /> <br />Motion by Councilmember Elvig, seconded by Councilmember Cook, to approve the <br />preliminary plat for Northfork Office Condos, contingent upon: compliance with the City Staff <br />Review Letter; revising the sizing assumptions for the community septic system that utilize the <br />proposed sizing suggestions stated in the City Staff Review Letter; providing information about <br />the exact location of the community septic system, alternate site, and community well with Lot 2, <br />Block 1, to ensure the undisturbed nature of the soil; and providing information, in a written <br />format, regarding the responsible party for management and maintenance of the community <br />septic system and well. <br /> <br />Motion carried. Voting Yes: Mayor Gamec, Councilmembers Elvig, Cook, Olson, Pearson, and <br />Strommen. Voting No: None. Absent: Councilmember Jeffrey. <br /> <br />Case #4: <br /> <br />Request to Rezone Property from E-1 Employment to Planned Unit <br />Development (PUD); Case of St. Andrew's Investment Group, LLC <br /> <br />City Council / October 24, 2006 <br />Page 12 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.